[ Graphic Version ] |
Project Backgound |
[ Brief Background ] [ Project Scope ] [ Project Management and Organisation ] [ Environmental Monitoring Objectives & Criteria ] [ Environmental Managment of the Site ] |
Environmental Monitoring and Audit Documents |
[ EIA ] [ Environmental Permit ] [ Project EM&A Manual ] [ Baseline Monitoring Report ] [ Locations of Monitoring Stations ] |
Environmental Monitoring and Audit Reporting |
Monthly EM&A Reports ] [ Quarterly EM&A Reports ] [ EM&A Data Results for Project ] |
[ Link to Government ] [ Contact Us ] [ Site Map ] |
Environmental Management of the Site |
An Environmental Impact Assessment (EIA) study has been undertaken to assess the environmental impacts (including noise, air and water impacts during the construction and operation phases of the project) and to identify appropriate mitigation measures. The EIA Report was approved by EPD under the EIA Ordinance and an Environmental Permit was granted for the construction and operation of the designated project.
The recommended mitigation measures in the Environmental Permit will incorporated into the project. These include:
![]() |
Tarpaulin covering of all dusty vehicle loads transported to, from and between site locations |
![]() |
Movable noise barriers |
![]() |
Road drainage with silt traps and petrol interceptors |
![]() |
Use of silt curtains around the dredging operations; use of silt screens at the intakes, restricted dredging rates and bulk filling behind constructed seawalls |