Contract
No: HK/2011/07 Wanchai Development Phase
II and Sampling, Field Measurement and
Testing Works
(Stage 2) Environmental Permit no. EP-356/2009, Further Evironmental permit nos.
fep-01/356/2009, fep-02/356/2009, FEP-03/356/2009, Fep-04/356/2009 and Fep-05/356/2009 Monthly Environmental Monitoring & Audit Report
- august 2012 -
|
CLIENTS: |
|
Civil Engineering and Development Department and Highways Department |
Lam Geotechnics Limited 11/F Centre Point Wanchai, H.K. Telephone:
(852) 2882-3939 Facsimile:
(852) 2882-3331 E-mail:
info@lamenviro.com Website:
http://www.lamenviro.com |
|
|
|
|
|
Certified by: |
|
Raymond
Dai Environmental
Team Leader |
|
DATE: |
|
11 September 2012 |
2.2 Scope of the Project and Site Description
2.3 Division of the Project Responsibility
2.4 Project Organization and Contact Personnel
3. Status of Regulatory Compliance
3.1 Status of Environmental Licensing and Permitting under
the Project
5.2 Real-time Noise Monitoring
6.2 Real-time noise Monitoring
6.5 Review of the Reasons for and the Implications of
Non-compliance
6.6 Summary of action taken in the event of and follow-up
on non-compliance
7. Cumulative Construction Impact due to the Concurrent
Projects
9. Complaints,
Notification of Summons and Prosecution
lIST OF TABLES
Table I Summary
of Water Quality Monitoring Exceedances in Reporting Month
Table II Summary
of Enhanced Dissolved Oxygen Monitoring Exceedances in Reporting Month
Table 2.1 Schedule 2
Designated Projects under this Project
Table 2.2 Details
of Individual Contracts under the Project
Table 2.3 Contact
Details of Key Personnel
Table 3.2 Cumulative
Summary of Valid Licences and Permits under Contract no. HY/2009/11
Table 3.3 Summary
of submission status under FEP-01/356/2009 Condition
Table 3.4 Cumulative
Summary of Valid Licences and Permits under Contract no. HK/2009/01
Table 3.5 Summary
of submission status under FEP-02/356/2009 Condition
Table 3.6 Cumulative
Summary of Valid Licences and Permits under Contract no. HK/2009/02
Table 3.7 Summary
of submission status under FEP-03/356/2009 Condition
Table 3.8 Cumulative
Summary of Valid Licences and Permits under Contract no. HY/2009/15
Table 3.9 Summary
of submission status under FEP-04/356/2009 Condition
Table 3.10 Cumulative
Summary of Valid Licences and Permits under Contract no. HK/2010/06
Table 3.11 Summary of
submission status under EP-356/2009 and FEP-05/356/2009 Condition
Table 3.12 Cumulative
Summary of Valid Licences and Permits under Contract no. HY/2009/19
Table 4.1 Noise
Monitoring Station
Table 4.2 Real
Time Noise Monitoring Station
Table 4.3 Air
Monitoring Station
Table 4.4 Marine Water
Quality Stations for Water Quality Monitoring
Table 4.5 Marine
Water Quality Monitoring Frequency and Parameters
Table 4.6 Marine
Water Quality Stations for Enhanced Water Quality Monitoring
Table 4.7 Marine
Water Quality Stations for Additional DO Monitoring
Table 5.1 Noise
Monitoring Stations for Contract no. HY/2009/11
Table 5.2 Noise
Monitoring Station for Contract nos. HK/2009/01, HK/2009/02 and HK/2010/06
Table 5.3 Noise
Monitoring Station for Contract no. HY/2009/15
Table 5.4 Noise
Monitoring Station for Contract no. HY/2009/19
Table 5.5 Real
Time Noise Monitoring Station for Contract no. HY/2009/11 and HY/2009/19
Table 5.6 Air
Monitoring Stations for Contract no. HY/2009/11
Table 5.7 Air
Monitoring Stations for Contract no. HK/2009/01
Table 5.8 Air
Monitoring Station for Contract no. HK/2009/02
Table 5.9 Air
Monitoring Station for Contract no. HY/2009/15
Table 5.10 Air
Monitoring Stations for Contract no. HY/2009/19
Table 5.11 Water
Monitoring Stations for Contract no. HY/2009/11
Table 5.12 Water
Monitoring Stations for Contract no. HK/2009/01
Table 5.13 Water
Monitoring Stations for Contract no. HK/2009/02
Table 5.14 Water
Monitoring Stations for Contract no. HK/2010/06
Table 5.15 Water
Monitoring Stations for Contract no. HY/2009/15
Table 5.16 Water
Monitoring Stations for Contract no. HY/2009/19
Table 5.17 Summary
of Water Quality Monitoring Exceedances in Reporting Month
Table 5.18 Summary
of Enhanced Dissolved Oxygen Monitoring Exceedances in Reporting Month
Table 5.19 Details of
Waste Disposal for Contract no. HK/2009/01
Table 5.20 Details of
Waste Disposal for Contract no. HK/2009/02
Table 5.21 Details of
Waste Disposal for Contract no. HY/2009/15
Table 5.22 Details of
Waste Disposal for Contract no. HK/2010/06
Table 5.23 Details of Waste
Disposal for Contract no. HY/2009/19
Table 8.1 Summary of
Environmental Inspections for Contract no. HK/2009/01
Table 8.2 Summary of
Environmental Inspections for Contract no. HK/2009/02
Table 8.3 Summary of
Environmental Inspections for Contract no. HY/2009/15
Table 8.4 Summary of
Environmental Inspections for Contract no. HK/2010/06
Table 8.5 Summary
of Environmental Inspections for Contract no. HY/2009/19
Table 9.1 Cumulative
Statistics on Complaints
Table 9.2 Cumulative
Statistics on Successful Prosecutions
Table 10.1 Construction
Activities and Recommended Mitigation Measures in Coming Reporting Month
lIST
OF FIGUREs
Figure 2.2 Project Organization Chart
Figure 2.3 Locations of Environmental Monitoring Stations
lIST OF APPENDIces
Appendix 3.1 Environmental Mitigation Implementation Schedule
Appendix 4.1 Action and Limit Level
Appendix 4.2 Copies of Calibration Certificates
Appendix 5.1 Monitoring Schedule for Reporting Month and Coming month
Appendix 5.2 Noise Monitoring Results and Graphical Presentations
Appendix 5.3 Air Quality Monitoring Results and Graphical Presentations, and Odour Patrol Results
Appendix 5.4 Water Quality Monitoring Results and Graphical Presentations
Appendix 5.4a Additional Dissolved Oxygen Monitoring Results
Appendix 5.5 Real-time Noise Monitoring Results and Graphical Presentations
Appendix 6.1 Event Action Plans
Appendix 6.2 Summary for Notification of Exceedance
Appendix 8.1 Construction Programme of Individual Contracts
Construction Activities for the Reported Period
¡P
The major work activities for Contract no.
HY/2009/11 was confirmed substantial complete by RSS on 4 January 2012. The
construction site was handed over to contractor HY/2009/19.
Marine
Works (at Wan Chai)
¡P
Rockfilling for rock bund
across HKCEC Water Channel from Ch220 to Ch230
¡P
Reclamation of HKCEC3W
within HKCEC Water Channel
¡P
Installation of pipe pile
wall for demolition of existing seawall at
¡P
Demolition of Wan Chai West Ferry Pier
Cross-Harbour
Watermains Installation (CHA & CHB) and Marine Works (at TST)
¡P
Rockfilling and rock
protection to cross-harbour watermains
¡P
Installation of
cross-harbour watermains No. A18 & B18
Fresh
Watermains, Cooling Watermains and Salt Watermains (On Land)
¡P
Mainlaying works at Zone
B1-5A, B2-1, B3-1, B4-3, B4-1A, B5-1(Switch Room), B5-3(Switch Room), A1-1,
A1-2, A1-3B, A2-2, A3-2A, A3-4B, A3-5B and A4-2A
¡P
The reinstatement of one
carriageway at Zone B2-1 Mainlaying Works at Zone B3-1 of Expo Drive Central
¡P
Breakup of concrete
surround and trimming of 1 no. existing intake and 2 no. existing discharge
pipe at Zone A1-1 and A1-2
¡P
Pipe laying works at
Heading No. H7
¡P
Heading No. H6c (Mainlaying
works by trenchless method)
¡P
Mainlaying and chamber
construction works at the traffic island near junction of
¡P
Mainlaying works at Zone
A3-2A of
¡P
Mainlaying works at
¡P
Mainlaying Works for a 1000
dia. Watermains (CHE) at
¡P
Reinstatement Works at
¡P
Pipe Laying works including
9 nos. cooling mains across E/D section within HKCEC Water Channel
¡P
Pipe Laying works including
9 nos. cooling mains across SCL section within HKCEC Water Channel
¡P
Pipe Laying works including
9 nos. cooling mains and 2no. cross harbour watermains at North Bank of HKCEC
Water Channel
¡P Modification
work of PTI and bus station at
¡P Self-testing
of the individual pumping systems for cooling mains work
¡P Wet
well was handed over to E & M for penstock leakage testing
¡P Reinstatement
at
¡P Cooling
mains installation at west of Gate 1 inside ex-pet garden and the steel
fixing and casting of the damaged
thrust box
¡P Cabling
works along
¡P Waterproofing
membrane at roof level at WSD Salt Water Pumping Station.
¡P E&M
works at WSD Salt Water Pumping Station
¡P Wall
shaft and roof slab casting of salt water intake culvert at Wan Shing Street
Bay 20 and steel fixing of 19B
¡P Removing
the strut & waling for road reinstatement near Bay 24 and backfilling of
salt water intake culvert at
¡P Sheetpiling
at Bay 11 and the grouting work
¡P Pile
cap steel fixing of Bay
¡P Concreting
the salt water intake culvert of Bay 4 and Bay 7 at WCR1 and concreting the
base slab of Bay 8
¡P Concreting
pile cap of IC1 and the construction of pile cap IC2 in salt water intake seaside
cofferdam.
¡P Excavation
and breaking up the rock down to 3rd layer of strut and waling installation of
the outfall launching shaft and then the 2nd layer waling
¡P Cutting
the opening of sheetpiles and coring of thrust wall between Launching Pit and
Jacking Pit
¡P Excavation
the fill material to expose HDPE pipe end by divers inside the outfall seaside
cofferdam
¡P Cutting
casing of pre-bored H-pile to cut-off level for pile cap at Bay 4 and Bay 5 of
Box Culvert N1 northern cofferdam
¡P Excavation
to formation level and making good of blinding layer for pile cap at Bay 4 and
Bay 5 of Box Culvert N1 northern cofferdam
¡P Concreting
the base slab of Box Culvert N1 Bay 2 and Bay 3 on UU bridge
¡P Dismantling
of steel panel & H-beam of water tank at zone 2B and the dismantling work
of water tank in zone 3B and
¡P Concreting
the columns at New Ferry Pier GL 6-7 / B-F level 1 to level 2 and erection
formwork and falsework at GL 8-15 / B-F
¡P Steel
fixing the slab at New Ferry Pier GL 1-8 level 1 and GL 9 -15 level 2
¡P Rockfilling
and placing bagged concrete for the seawall block area at WCR2
¡P Reclamation
of WCR2
¡P TDMP
for Box Culvert ¡§O¡¨ Diversion at Bay 12-13
¡P Bulkhead
wall at
¡P Water
pressure test and sterilization test for 150MS freshwater pipe at Box Culvert ¡§O¡¨
prior to the diversion of captioned water pipe.
¡P Trial
pit excavation and preparation works for Hung Hing Road Diversion
¡P Removal
of temporary reclamation at TS1
¡P Underwater
cutting of temporary diaphragm walls at TS1
¡P Dredging
for seawall foundation at TS2
¡P Seawall
trench works at TS2
¡P Pile
head breaking
¡P Sonic
tube trimming
¡P
Marine bored piling
¡P
Construction works for Box Culvert T
Real-time
Noise Monitoring
Air Quality Monitoring
CMA1b: from 27 Jul and 20 August 2012 to 31 Jul and
21 August 2012
CMA2a: from 27 Jul and 8 August 2012 to 28 Jul and
10 August 2012
CMA5a: from 20 August 2012 to 21 August 2012
CMA6a: from 8 August 2012 to 9 August 2012
CMA2a: from 9 August 2012 to 11 August 2012
Water Quality Monitoring
Table I Summary of Water Quality Monitoring Exceedances in
Reporting Month
Contract
no. |
Water
Monitoring Station |
Mid-flood |
Mid-ebb |
|||||||||||
DO |
Turbidity |
SS |
DO |
Turbidity |
SS |
|||||||||
|
LL |
|
LL |
|
LL |
|
LL |
|
LL |
|
LL |
|||
HY/2009/11 |
WSD9 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
Monitoring finished on 6 Feb 2012 |
WSD10 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
WSD15 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
WSD17 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
C8 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
C9 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
HK/2009/01 |
WSD19 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
C1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
C3 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
C4e |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
C4w |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
Monitoring finished on 27 April 2012 |
WSD20 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
WSD7 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
HK/2009/01 & HK/2010/06 |
C2 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
HK/2009/02 |
C5e |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
C5w |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
0 |
1 |
|
Monitoring started on 8 Feb 2012 |
WSD21 |
0 |
0 |
0 |
0 |
2 |
0 |
1 |
0 |
0 |
0 |
0 |
0 |
|
WSD9 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
WSD17 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
HY/2009/15 |
C7 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
HY/2009/19 Monitoring started on 28 Jan 2012 |
C8 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
1 |
1 |
|
C9 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
Total |
2 |
0 |
0 |
0 |
4 |
0 |
1 |
0 |
0 |
2 |
2 |
2 |
||
Remarks: -
The
cessation of seawater intake operation for C6 was confirmed on 17 May 2011, the
water monitoring at C6 was then terminated since 17 May 2011.
-
WSD9 and WSD17 were implemented with respect to HK/2009/02 from 8 Feb 2012.
- 4-week water quality monitoring at
WSD9, WSD10, WSD15, WSD17, C8 and C9 were completed on 6 Feb 2012.
- C8 and C9 were implemented with
respect to HY/2009/19 from 28 Jan 2012.
- WSD7 and WSD20 water quality
monitoring were temporarily suspended from 27 Apr 2012.
Table II Summary of Enhanced
Dissolved Oxygen Monitoring Exceedances in Reporting Month
Contract no. |
Water Monitoring Station |
Mid-flood |
Mid-ebb |
||
DO |
DO |
||||
|
LL |
|
LL |
||
HY/2009/15 |
C6 |
0 |
0 |
0 |
0 |
C7 |
2 |
0 |
0 |
0 |
|
Ex-WPCWA SW |
0 |
0 |
0 |
4 |
|
Ex-WPCWA SE |
5 |
0 |
4 |
3 |
|
Total |
7 |
0 |
4 |
7 |
Complaints, Notifications of Summons and Successful
Prosecutions
Site Inspections and Audit
Future Key Issues
Contract no. HY/2009/11- North Point
Reclamation
¡P
The major work activities for Contract no.
HY/2009/11 was confirmed substantial complete by RSS on 4 January 2012. The
construction site was handed over to contractor HY/2009/19 on 31 December 2011.
Contract no. HK/2009/01 - Wan Chai
Development Phase II ¡V Central ¡VWanchai Bypass at HKCEC
Marine Works
¡P
Reclamation works within HKCEC Water Channel (from
CH170 to CH220)
¡P
Rockfilling for formation of rock bund within HKCEC
Water Channel (from CH220 to CH230)
¡P
Installation pipe pile wall for modification of
vertical seawall near
¡P
Rockfilling at northeast of Area 9 and Area7 near
¡P
Demolition of Wan Chai West Ferry Pier
¡P
Cross-Harbour Watermains Installation (CHA &
CHB) Trust block construction, concrete coating for flange joint and
rockfilling protection works for cross-harbour watermains in Victoria Harbour
¡P
Reinstatement works at TST seashore including
removal of silt screen and dismantling of jack-up barge
Fresh
Watermains, Cooling Watermains and Salt Watermains (On Land)
¡P
Zone B1-5A, B2-1, B4-1A, B4-3, B5-1, B5- 3, A1-1,
A1-2, A1-3B, A2-2, A3-2A, A3-4B, A3-5B, A4-2A
¡P
Mainlaying works and G.I. ducting works at Zone
B1-5A, B4-1A and B4-3
¡P
Mainlaying works at Zone B3-1
¡P
Mainlaying works across the run-out of Renaissance
Harbour View Hotel by open-cut method
¡P
Mainlaying works at
¡P
Mainlaying works at traffic island near junction
between
¡P
Pipe laying works at Zone A3-2A would be completed
and heading no. H1
¡P
Mainlaying works at Zone A3-5B of
¡P
No. H6C excavation works.
¡P
Pipe laying works for cross harbour watermains
within HKCEC water channel
Contract no. HK/2009/02 - Wan Chai Development
Phase II ¡V Central ¡V Wan Chai Bypass at WanChai East
¡P
Complete PTI modification works after completion of
New Public Toilet in
¡P
Complete the initial testing of P7, P8 and P9
pumping station.
¡P
Complete all cooling mains and cabling works for P7,
P8 & P9 Pumping Stations permanent power-on and signal control.
¡P
800MS pipe installation inside
¡P
ABWFs & E&M works of WSD Salt Water Pumping
Station.
¡P
Conduct Fire Service Inspection of WSD Salt Water Pumping Station
¡P
Complete the finishing works of WSD Salt Water
Pumping Station.
¡P
Complete WSD intake A and Intake B in-situ concrete
work.
¡P
Construction of Bay 1b ¡V 2, Bay 6 ¡V 8 salt water
intake culverts at WCR1 area.
¡P
Continue construction salt water intake
¡P
Commence salt water intake culvert at transition
bays inside jacking pit and receiving pit.
¡P
Continue remaining drainage works and reinstatement
works along
¡P
Commence HDPE piping on UU Bridge and inside
launching pit.
¡P
Construction for Box Culvert N1 at WCR1 area.
¡P
Complete concreting works for the Level 2 at the
New Ferry Pier.
¡P
Reclamation works at WCR2 area.
¡P
Commence drainage work to suit TWCR4 construction.
¡P
Diversion of uncharted drainage works at Box
culvert ¡§O¡¨.
¡P
Continue trial excavation and preparation works for
Hung Hing Road Diversion
Contract no. HY/2009/15 - Central-Wanchai Bypass ¡V
Tunnel (
¡P
TZ1 reclamation works
¡P
Seawall trench works at TS2
¡P
Formation of temporary seawall at TS2
¡P
Dredging at TS2
¡P
Pile head breaking
¡P
Sonic tube trimming
Contract no. HY/2009/19- Wan Chai
Bypass Tunnel (North Point Section) and Island Eastern Corridor Link
¡P
Construction works for Box Culvert T
¡P
Marine Piling
1.1.1.
Lam Geotechnics Limited (LGL) has been appointed to
work as the Environmental Team (ET) under Environmental Permit no. EP-356/2009
and Further Environmental permit nos. FEP-01/356/2009, FEP-02/356/2009,
FEP-03/356/2009, FEP-04/356/2009 and FEP-05/356/2009 to implement the
Environmental Monitoring and Audit (EM&A) programme as stipulated in the
EM&A Manual of the approved Environmental Impact Assessment (EIA) Report
for Wan Chai Development phase II and Central-Wan Chai Bypass (Register No.:
AEIAR-125/2008) and in the EM&A Manual of the approved EIA Report for
Central-Wan Chai Bypass and Island Eastern Corridor Link (Register No. AEIAR-014/2001).
1.1.2.
This report presents the environmental monitoring
and auditing work carried out in accordance to the Section 10.3 of EM&A
Manual and ¡§Environmental Monitoring and Audit Requirements¡¨ under
Particular Specification Section 27.
1.1.3.
This report documents the finding of EM&A works
for Environmental Permit no. EP-356/2009, Further Environmental Permit no.
FEP-01/356/2009, FEP-02/356/2009, FEP-03/356/2009, FEP-04/356/2009 and
FEP-05/356/2009 and during the period of July
to August. The cut-off
date of reporting is at 27th of each reporting month.
Section 1 Introduction ¡V details the
scope and structure of the report.
Section 2 Project
Background ¡V summarizes background and scope of the project, site
description, project organization and contact details of key personnel during
the reporting period.
Section 3 Status of Regulatory Compliance ¡V summarizes the
status of valid Environmental Permits / Licenses during the reporting period.
Section 4 Monitoring
Requirements ¡V summarizes all monitoring parameters, monitoring
methodology and equipment, monitoring locations, monitoring frequency, criteria
and respective event and action plan and monitoring programmes.
Section 5 Monitoring
Results ¡V summarizes the monitoring results obtained in the
reporting period.
Section 6 Compliance Audit ¡V summarizes the auditing of monitoring results, all exceedances
environmental parameters.
Section 7 Cumulative Construction Impact due to the Concurrent Projects ¡V summarizes the relevant cumulative construction impact due to the
concurrent activities of the concurrent Projects.
Section 8 Site Inspection ¡V summarizes the findings of weekly site
inspections undertaken within the reporting period, with a review of any relevant follow-up actions within the reporting period.
Section 9 Complaints, Notification of summons and Prosecution ¡V summarizes the cumulative statistics on complaints, notification of summons and
prosecution
Section 10 Conclusion
2.1.1.
¡§Wan Chai Development phase II and Central-Wan Chai
Bypass¡¨ and ¡§Central-Wan Chai Bypass and Island Eastern Corridor Link¡¨
(hereafter called ¡§the Project¡¨) are Designed Project (DP) under the
Environmental Impact Assessment Ordinance (Cap. 499) (EIAO). The Environmental
Impact Assessment (EIA) Reports for Central-Wan Chai Bypass and
2.1.2.
The key purpose of Wan Chai Development Phase II
(WDII) is to provide land at Wan Chai North and North Point for construction of
the Central-Wan Chai Bypass and Island Eastern Corridor Link (CWB). Land formed
under the project will be developed as a world-class waterfront promenade
joining that at the new Central waterfront for public enjoyment.
2.1.3.
There is a compelling and present need for the CWB
to provide relief to the very congested
2.2.1.
The Project is located mainly in Wan Chai North,
2.2.2.
The study area encompasses existing developments
along the Wan Chai,
2.2.3.
The scope of the Project comprises:
¡P
Land
formation for key transport infrastructure and facilities, including the Trunk
Road (i.e.
CWB) and the associated slip roads for connection to the Trunk Road and for through
traffic from Central to Wan Chai and Causeway Bay. The land formed for the above
transport infrastructure will provide opportunities for the development of an attractive
waterfront promenade for the enjoyment of the public
¡P
Reprovisioning
/ protection of the existing facilities and structures affected by the land
formation works mentioned above
¡P
Extension,
modification, reprovisioning or protection of existing storm water drainage
outfalls, sewerage outfalls and watermains affected by the revised land use and
land formation works mentioned above
¡P
Upgrading
of hinterland storm water drainage system and sewerage system, which would be
rendered insufficient by the land formation works mentioned above
¡P
Provision
of the ground level roads, flyovers, footbridges, necessary transport
facilities and the associated utility services
¡P
Construction
of the new waterfront promenade, landscape works and the associated utility
services
¡P
The
Trunk Road (i.e. CWB) within the study area and the associated slip roads for
connection to the Trunk Road.
2.2.4.
The project also contains various Schedule 2 DPs
that, under the EIAO, require Environmental Permits (EPs) to be granted by the
DEP before they may be either constructed or operated. Table 2.1
summarises the five individual DPs under this Project. Figure 2.1 shows the
locations of these Schedule 2 DPs.
Table 2.1 Schedule
2 Designated Projects under this Project
Item |
Designated
Project |
EIAO
Reference |
Reason for
inclusion |
DP1 |
Central-Wanchai Bypass (CWB) including its road tunnel and slip roads |
Schedule 2, Part I, A.1 and A.7 |
Trunk road and road tunnel more than 800 m in length |
DP2 |
Road P2 and other roads which are classified as primary/district
distributor roads |
Schedule 2, Part I, A.1 |
Primary / district distributor roads |
DP3 |
Reclamation works including associated dredging works |
Schedule 2, Part I, C.1 and C.12 |
Reclamation more than 5 ha in size and a dredging operation less than
100 m from a seawater intake point |
DP5 |
Wan Chai East Sewage Outfall |
Schedule 2, Part I, F.5 and F.6 |
Submarine sewage pipelines with a total diameter more than 1,200 mm
and include a submarine sewage outfall |
DP6 |
Dredging for the Cross-harbour Water Mains from Wan Chai to Tsim Sha
Tsui |
Schedule 2, Part I, C.12 |
A dredging operation less than 100 m from a seawater intake point |
2.3.1.
Due to the multi-contract nature of the Project,
there are a number of contracts sub-dividing the whole works area into
different work areas to be commenced. Contractors of individual contracts will
be required by the EP holder to apply Further Environmental Permits (FEP) such
that the impact monitoring stations are sub-divided accordingly to facilitate
the implementation of EM&A programme and to streamline the EM&A
reporting for individual FEP holders correspondingly.
2.3.2.
The details of individual contracts are summarized
in Table 2.2.
Table 2.2 Details
of Individual Contracts under the Project
Contract
No. |
Contract Title |
Associated
DP(s) |
Construction
Commencement Date |
HK/2009/01 |
Wan Chai Development Phase II ¡V Central ¡VWanchai Bypass at |
DP3, DP6 |
23 July 2010 |
DP1, DP2 |
25 August 2011 |
||
HK/2009/02 |
Wan Chai Development Phase II ¡V Central ¡V Wan Chai Bypass at WanChai
East |
DP3, DP5 |
5 July 2010 |
DP1 |
26 April 2011 |
||
HY/2009/11 |
Wan Chai Development Phase II and Central ¡V Wan Chai Bypass ¡V North Point
Reclamation |
DP3 |
17 March 2010 (Under application of surrender) |
HY/2009/15 |
Central-Wanchai Bypass ¡V Tunnel ( |
DP3 |
10 November 2010 |
DP1 |
13 July 2011 |
||
HK/2010/06 |
Wan Chai Development Phase II-Central-Wan Chai Bypass over MTR Tsuen
Wan Line |
DP3 |
22 March 2011 |
04/HY/2006 |
Reconstruction of Bus Terminus near |
DP1 |
September 2010 |
HY/2009/17 |
Central - Wan Chai Bypass (CWB) at FEHD Whitfield Depot - Advanced
piling works. |
DP1 |
5 October 2010 |
HY/2009/18 |
Central - Wan Chai Bypass (CWB) ¡V Central Interchange |
DP1 |
21 April 2011 |
HY/2009/19 |
Central - Wanchai Bypass Tunnel (North Point Section) and Island
Eastern Corridor Link |
DP1 |
24 March 2011 |
2.4.1.
Civil Engineering and Development Department and
Highways Department are the overall project controllers for the Wan Chai
Development Phase II and Central-Wan Chai Bypass respectively. For the
construction phase of the Project, Project Engineer, Contractor(s), Environmental
Team and Independent Environmental Checker are appointed to manage and control
environmental issues.
2.4.2.
The proposed project organization and lines of
communication with respect to environmental protection works are shown in Figure
2.2. Key personnel
and contact particulars are summarized in Table 2.3:
Table 2.3 Contact Details of
Key Personnel
Party |
Role |
Post |
Name |
Contact No. |
Contact Fax |
AECOM |
Engineer¡¦s Representative for WDII |
Principal Resident Engineer |
Mr. Frankie Fan |
2587 1778 |
2587 1877 |
Engineer¡¦s Representative for CWB |
Principal Resident Engineer |
Mr. Peter Poon |
3922 8332 |
3529 2829 |
|
|
Contractor under Contract no. HY/2009/11 |
Project Director |
Mr. Cho Yu Fun |
3157 1086 |
3157 1085 |
Project
Manager |
Mr. Gregory Wong |
3157 1086 |
|||
Site Agent |
Mr. Daniel Cheung |
3157 1086 |
|||
Environmental
Officer |
Mr. C. M. Wong |
3157 1086 |
|||
Chun Wo ¡V Leader Joint Venture |
Contractor under Contract no. HK/2009/01 |
Project Director |
|
2162 9909 |
2587 1878 |
Site Agent |
Mr. Paul Yu |
9456 9819 |
|||
Sub-Agent |
Mr Terry Wong |
9757 9846 |
|||
Construction
Manager |
Mr. Wyman
Wong |
9627 2467 |
|||
Construction
Manager |
Mr. Jack Chu |
9775 3008 |
|||
Construction
Manager |
Mr. KK Yuen |
9498 1213 |
|||
Environmental
Officer (Compliance Manager) |
Mr. Andy Mak |
9103 2370 |
|||
Chun Wo ¡V CRGL Joint Venture |
Contractor under Contract no. HK/2009/02 |
Site Agent |
Mr. Chan Sing Cho |
3658 3002 |
2827 9996 |
Quality & Environmental Manager (Environmental Officer) |
Mr. C.P. Ho |
3658 3000 |
|
||
|
Contractor under Contract no. HY/2009/15 |
Project Director |
Chan Wai Hung |
2823 7813 |
2865 5229 |
Site Manager |
P J Fan |
3557 6368 |
2566 2192 |
||
|
|
Contractor¡¦s Representative |
Mr. David Lau |
3557 6358 |
|
|
|
Head of Construction Manager |
Roger Cheung |
3557 6371 |
|
|
|
Senior Construction Manager |
Gene Cheung |
3557 6395 |
|
|
|
Environmental Officer |
Mr. Daniel Sin |
3557 6347 |
|
Gammon -Leader JV |
Contractor under Contract no. HK/2010/06 |
Project
Manager |
Mr. Paul Lui |
9095 7922 |
2529 2880 |
Site Agent |
Mr. Keith Tse |
2529 2068 |
|||
Environmental
Officer |
Mr. Lee Wai Man |
9481 6024 |
|||
Chun Wo - CRGL - MBEC Joint Venture |
Contractor under Contract no. HY/2009/19 |
Project Manager |
Mr. Rayland Lee |
3758 8879 |
2570 8013 |
Site Agent |
Mr. Cheung Kit Cheung |
6909 1555 |
|||
Environmental
Engineer |
Mr. Calvin Leung |
9286 9208 |
|||
Environmental Manager / Environmental
Officer |
Mr. M.H. Isa |
9884 0810 |
|||
Construction Manager (Land) |
Patrick Cheung |
9643 3012 |
|||
Construction Manager (Land) |
Eric Fong |
6191 9337 |
|||
Operation Manager (Land) |
Yung Kwok Wah |
9834 1010 |
|||
ENVIRON Hong Kong Limited |
Independent
Environmental Checker (IEC) |
Independent Environmental Checker (IEC) |
Mr. David Yeung |
3743 0788 |
3548 6988 |
Lam Geotechnics Limited |
Environmental
Team (ET) |
Environmental Team Leader (ETL) |
Mr. Raymond Dai |
2882 3939 |
2882 3331 |
2.4.3.
For Contract no. HY/2009/11, the principal work
activities in this reporting month included:
¡P
The major work activities for Contract no.
HY/2009/11 was confirmed substantial complete by RSS on 4 January 2012. The
construction site was handed over to contractor HY/2009/19
on 31 December 2011.
2.4.4.
For Contract no. HK/2009/01, the principal work
activities in this reporting month included:
Marine Works
(at Wan Chai)
¡P
Rockfilling for rock bund
across HKCEC Water Channel from Ch220 to Ch230
¡P
Reclamation of HKCEC3W
within HKCEC Water Channel
¡P
Installation of pipe pile
wall for demolition of existing seawall at
¡P
Demolition of Wan Chai West
Ferry Pier
Cross-Harbour
Watermains Installation (CHA & CHB) and Marine Works (at TST)
¡P
Rockfilling and rock
protection to cross-harbour watermains
¡P
Installation of
cross-harbour watermains No. A18 & B18
Fresh
Watermains, Cooling Watermains and Salt Watermains (On Land)
¡P
Mainlaying works at Zone B1-5A,
B2-1, B3-1, B4-3, B4-1A, B5-1(Switch Room), B5-3(Switch Room), A1-1, A1-2,
A1-3B, A2-2, A3-2A, A3-4B, A3-5B and A4-2A
¡P
The reinstatement of one
carriageway at Zone B2-1 Mainlaying Works at Zone B3-1 of Expo Drive Central
¡P
Breakup of concrete
surround and trimming of 1 no. existing intake and 2 no. existing discharge
pipe at Zone A1-1 and A1-2
¡P
Pipe laying works at
Heading No. H7
¡P
Heading No. H6c (Mainlaying
works by trenchless method)
¡P
Mainlaying and chamber
construction works at the traffic island near junction of
¡P
Mainlaying works at Zone
A3-2A of
¡P
Mainlaying works at
¡P
Mainlaying Works for a 1000
dia. Watermains (CHE) at
¡P
Reinstatement Works at
¡P
Pipe Laying works including
9 nos. cooling mains across E/D section within HKCEC Water Channel
¡P
Pipe Laying works including
9 nos. cooling mains across SCL section within HKCEC Water Channel
¡P
Pipe Laying works including
9 nos. cooling mains and 2no. cross harbour watermains at North Bank of HKCEC
Water Channel
2.4.5.
For Contract no. HK/2009/02, the principal work
activities in this reporting month included:
¡P
Modification work of PTI
and bus station at
¡P
Self-testing of the
individual pumping systems for cooling mains work
¡P
Wet well was handed over to
E & M for penstock leakage testing
¡P
Reinstatement at
¡P
Cooling mains installation
at west of Gate 1 inside ex-pet garden and the steel fixing and casting of the damaged thrust box
¡P
Cabling works along
¡P
Waterproofing membrane at roof
level at WSD Salt Water Pumping Station.
¡P
E&M works at WSD Salt
Water Pumping Station
¡P
Wall shaft and roof slab
casting of salt water intake culvert at Wan Shing Street Bay 20 and steel
fixing of 19B
¡P
Removing the strut &
waling for road reinstatement near Bay 24 and backfilling of salt water intake
culvert at
¡P
Sheetpiling at Bay 11 and
the grouting work
¡P
Pile cap steel fixing of
Bay
¡P
Concreting the salt water
intake culvert of Bay 4 and Bay 7 at WCR1 and concreting the base slab of Bay 8
¡P
Concreting pile cap of IC1
and the construction of pile cap IC2 in salt water intake seaside cofferdam.
¡P
Excavation and breaking up
the rock down to 3rd layer of strut and waling installation of the outfall
launching shaft and then the 2nd layer waling
¡P
Cutting the opening of
sheetpiles and coring of thrust wall between Launching Pit and Jacking Pit
¡P
Excavation the fill
material to expose HDPE pipe end by divers inside the outfall seaside cofferdam
¡P
Cutting casing of pre-bored
H-pile to cut-off level for pile cap at Bay 4 and Bay 5 of Box Culvert N1 northern
cofferdam
¡P
Excavation to formation
level and making good of blinding layer for pile cap at Bay 4 and Bay 5 of Box
Culvert N1 northern cofferdam
¡P
Concreting the base slab of
Box Culvert N1 Bay 2 and Bay 3 on UU bridge
¡P
Dismantling of steel panel
& H-beam of water tank at zone 2B and the dismantling work of water tank in
zone 3B and
¡P
Concreting the columns at
New Ferry Pier GL 6-7 / B-F level 1 to level 2 and erection formwork and
falsework at GL 8-15 / B-F
¡P
Steel fixing the slab at
New Ferry Pier GL 1-8 level 1 and GL 9 -15 level 2
¡P
Rockfilling and placing
bagged concrete for the seawall block area at WCR2
¡P
Reclamation of WCR2
¡P
TDMP for Box Culvert ¡§O¡¨
Diversion at Bay 12-13
¡P
Bulkhead wall at
¡P
Water pressure test and sterilization
test for 150MS freshwater pipe at Box Culvert ¡§O¡¨ prior to the diversion of
captioned water pipe.
¡P
Trial pit excavation and
preparation works for Hung Hing Road Diversion
2.4.6.
For Contract no. HY/2009/15, the principal work
activities in this reporting month included:
¡P
Removal of temporary
reclamation at TS1
¡P
Underwater cutting of
temporary diaphragm walls at TS1
¡P
Dredging for seawall
foundation at TS2
¡P
Seawall trench works at TS2
2.4.7.
For Contract no. HK/2010/06, the principal work
activities in this reporting month included:
¡P
Pile head breaking
¡P
Sonic tube trimming
2.4.8.
For Contract no. HY/2009/19, the principal work
activity in this reporting month included:
¡P
Construction works for Box Culvert T
¡P
Marine Piling
2.4.9.
In coming reporting month, the principal work
activities of individual contracts are anticipated as follows:
Contract no. HY/2009/11- North Point
Reclamation
¡P
The
major work activities for Contract no. HY/2009/11 was confirmed substantial
complete by RSS on 4 January 2012. The construction site was handed over to contractor HY/2009/19 on 31
December 2011.
Contract no. HK/2009/01 - Wan Chai
Development Phase II ¡V Central ¡VWanchai Bypass at HKCEC
Marine Works
¡P
Reclamation works within HKCEC Water Channel (from
CH170 to CH220)
¡P
Rockfilling for formation of rock bund within HKCEC
Water Channel (from CH220 to CH230)
¡P
Installation pipe pile wall for modification of
vertical seawall near
¡P
Rockfilling at northeast of Area 9 and Area7 near
¡P
Demolition of Wan Chai West Ferry Pier
¡P
Cross-Harbour Watermains Installation (CHA &
CHB) Trust block construction, concrete coating for flange joint and
rockfilling protection works for cross-harbour watermains in Victoria Harbour
¡P
Reinstatement works at TST seashore including
removal of silt screen and dismantling of jack-up barge
Fresh
Watermains, Cooling Watermains and Salt Watermains (On Land)
¡P
Zone B1-5A, B2-1, B4-1A, B4-3, B5-1, B5- 3, A1-1,
A1-2, A1-3B, A2-2, A3-2A, A3-4B, A3-5B, A4-2A
¡P
Mainlaying works and G.I. ducting works at Zone
B1-5A, B4-1A and B4-3
¡P
Mainlaying works at Zone B3-1
¡P
Mainlaying works across the run-out of Renaissance
Harbour View Hotel by open-cut method
¡P
Mainlaying works at
¡P
Mainlaying works at traffic island near junction
between
¡P
Pipe laying works at Zone A3-2A would be completed
and heading no. H1
¡P
Mainlaying works at Zone A3-5B of
¡P
No. H6C excavation works.
¡P
Pipe laying works for cross harbour watermains
within HKCEC water channel
Contract no.
HK/2009/02 - Wan Chai Development Phase II ¡V Central ¡V Wan Chai Bypass at
WanChai East
¡P
Complete PTI modification works after completion of
New Public Toilet in
¡P
Complete the initial testing of P7, P8 and P9
pumping station.
¡P
Complete all cooling mains and cabling works for P7,
P8 & P9 Pumping Stations permanent power-on and signal control.
¡P
800MS pipe installation inside
¡P
ABWFs & E&M works of WSD Salt Water Pumping
Station.
¡P
Conduct Fire Service Inspection of WSD Salt Water Pumping Station
¡P
Complete the finishing works of WSD Salt Water
Pumping Station.
¡P
Complete WSD intake A and Intake B in-situ concrete
work.
¡P
Construction of Bay 1b ¡V 2, Bay 6 ¡V 8 salt water
intake culverts at WCR1 area.
¡P
Continue construction salt water intake
¡P
Commence salt water intake culvert at transition
bays inside jacking pit and receiving pit.
¡P
Continue remaining drainage works and reinstatement
works along
¡P
Commence HDPE piping on UU Bridge and inside
launching pit.
¡P
Construction for Box Culvert N1 at WCR1 area.
¡P
Complete concreting works for the Level 2 at the
New Ferry Pier.
¡P
Reclamation works at WCR2 area.
¡P
Commence drainage work to suit TWCR4 construction.
¡P
Diversion of uncharted drainage works at Box
culvert ¡§O¡¨.
¡P
Continue trial excavation and preparation works for
Hung Hing Road Diversion
Contract no. HY/2009/15 -
Central-Wanchai Bypass ¡V Tunnel (
¡P
TZ1 reclamation works
¡P
Seawall trench works at TS2
¡P
Formation of temporary seawall at TS2
¡P
Dredging at TS2
Contract no. HK/2010/06 - Wan Chai
Development Phase II ¡V Central ¡V Wan Chai Bypass over MTR Tsuen Wan Line
¡P
Pile head breaking
¡P
Sonic tube trimming
Contract no. HY/2009/19 ¡V Central- Wan
Chai Bypass Tunnel (North Point Section) and Island Eastern Corridor Link
¡P
Construction
works for Box Culvert T
¡P
Marine
Piling
3.1.1.
A summary of the current status on licences and/or
permits on environmental protection pertinent to the Project is shown in Table
3.1.
Permits and/or
Licences |
Reference No. |
Issued Date |
Status |
Environmental Permit |
EP-356/2009 |
30 Jul 2009 |
Valid |
Environmental Permit |
EP-364/2009/A |
4 Aug 2010 |
Valid |
Environmental Permit |
EP-364/2009 |
17 Aug 2009 |
Superseded |
Environmental Permit |
EP-376/2009 |
13 Nov 2010 |
Valid |
Further Environmental
Permit |
FEP-01/356/2009 |
18 Feb 2010 |
Under application of surrender |
Further Environmental
Permit |
FEP-02/356/2009 |
24 Mar 2010 |
Valid |
Further Environmental
Permit |
FEP-03/356/2009 |
24 Mar 2010 |
Valid |
Further Environmental Permit |
FEP-04/356/2009 |
22 Nov 2010 |
Valid |
Further Environmental Permit |
FEP-05/356/2009 |
24 Mar 2011 |
Valid |
Further Environmental Permit |
FEP-01/364/2009 |
24 Mar 2010 |
Valid |
Further Environmental Permit |
FEP-02/364/2009 |
21 Apr 2010 |
Valid |
Further Environmental Permit |
FEP-03/364/2009 |
12 Jul 2010 |
Valid |
Further Environmental Permit |
FEP-04/364/2009/A |
14 Oct 2010 |
Surrendered |
Further Environmental Permit |
FEP-05/364/2009/A |
15 Nov 2010 |
Valid |
Further Environmental Permit |
FEP-06/364/2009/A |
22 Nov 2010 |
Valid |
Further Environmental Permit |
FEP-07/364/2009/A |
25 Feb 2011 |
Valid |
Further Environmental Permit |
FEP-08/364/2009/A |
15 Jun 2012 |
Valid |
3.1.2.
Due to the multi-contract nature of the Project,
the status of permits and/or licences under the individual contract(s) are
presented as below:
Contract no. HY/2009/11 ¡V
Central ¡V Wanchai Bypass, North Point Reclamation
3.1.3.
The major work activities for Contract no.
HY/2009/11 was confirmed substantial complete by RSS on 4 January 2012. The
construction site was handed over to contractor HY/2009/19 on 31 December 2011.
3.1.4.
Summary of the current status on licences and/or
permits on environmental protection pertinent and submission under
FEP-01/356/2009 for contract no. HY/2009/11 are shown in Table 3.2 and
Table 3.3.
3.1.5.
Contractor submitted a letter dated 20 July 2011 to
confirm that the dredging works and dumping operation were completed.
Table 3.2 Cumulative Summary of Valid Licences and
Permits under Contract
no. HY/2009/11
Permits and/or Licences |