Contract No: HK/2011/07 Wanchai
Development Phase II and Sampling, Field
Measurement and Testing Works (Stage 2) Environmental Permit no. EP-356/2009, Further Evironmental
permit nos. fep-02/356/2009, FEP-03/356/2009, Fep-04/356/2009 ,Fep-05/356/2009,
Fep-06/356/2009 and FEP-07/356/2009 Monthly Environmental Monitoring & Audit Report
- AUgust 2013 -
|
CLIENTS: |
|
Civil Engineering and
Development Department and Highways Department |
Lam Geotechnics Limited 11/F Centre Point Wanchai, H.K. Telephone:
(852) 2882-3939 Facsimile:
(852) 2882-3331 E-mail:
info@lamenviro.com Website:
http://www.lamenviro.com |
|
|
|
|
|
Certified
by: |
|
Raymond
Dai Environmental
Team Leader |
|
DATE: |
|
September 2013 |
2.2 Scope of the Project and Site Description
2.3 Division of the Project Responsibility
2.4 Project Organization and Contact Personnel
3. Status of Regulatory Compliance
3.1 Status of Environmental Licensing and Permitting under
the Project
5.2 Real-time Noise Monitoring
6.2 Real-time noise Monitoring
6.5 Review of the Reasons for and the Implications of
Non-compliance
6.6 Summary of action taken in the event of and follow-up
on non-compliance
7. Cumulative Construction Impact due to the Concurrent
Projects
9. Complaints, Notification of Summons and Prosecution
lIST OF TABLES
Table I Summary of Water Quality Monitoring Exceedances in
Reporting Month
Table II Summary of Enhanced Dissolved Oxygen Monitoring
Exceedances in Reporting Month
Table 2.1 Schedule 2 Designated Projects under this Project
Table 2.2 Details of Individual Contracts under the Project
Table 2.3 Contact Details of Key Personnel
Table 3.4 Cumulative Summary of Valid Licences and Permits under
Contract no. HK/2009/01
Table 3.5 Summary of submission status under FEP-02/356/2009
Condition
Table 3.6 Cumulative Summary of Valid Licences and Permits under
Contract no. HK/2009/02
Table 3.7 Summary of submission status under FEP-03/356/2009
Condition
Table 3.8 Cumulative Summary of Valid Licences and Permits under
Contract no. HY/2009/15
Table 3.9 Summary of submission status under FEP-04/356/2009
Condition
Table 3.10 Cumulative Summary of Valid Licences and Permits under
Contract no. HK/2010/06
Table 3.11 Summary of submission status under EP-356/2009 and
FEP-05/356/2009 Condition
Table 3.12 Cumulative Summary of Valid Licences and Permits under
Contract no. HY/2009/19
Table 3.13 Cumulative Summary of Valid
Licences and Permits under Contract no. HK/2012/08
Table 3.14 Summary of submission status
under EP-356/2009 and FEP-06/356/2009 Condition
Table 3.15 Cumulative Summary of Valid
Licences and Permits under Contract no. HY/2010/08
Table 3.16 Summary of submission status under EP-356/2009 and FEP-07/356/2009 Condition
Table 4.1 Noise Monitoring Station
Table 4.2 Real Time Noise Monitoring Station
Table 4.3 Air Monitoring Station
Table 4.4 Marine Water Quality Stations for Water Quality
Monitoring
Table 4.5 Marine Water Quality Monitoring Frequency and
Parameters
Table 4.6 Marine Water Quality Stations for Enhanced Water
Quality Monitoring
Table 4.7 Marine Water Quality Stations for Additional DO
Monitoring
Table 5.2 Noise Monitoring Station for Contract nos. HK/2009/01,
HK/2009/02 and HK/2010/06
Table 5.3 Noise Monitoring Station for Contract no. HY/2009/15
Table 5.4 Noise Monitoring Station for Contract no. HY/2009/19
Table 5.5 Real Time Noise Monitoring Station for Contract no.
HY/2009/19
Table
5.7 Air Monitoring Station for Contract no.
HK/2009/01
Table 5.8 Air Monitoring Station for Contract no. HK/2009/02
Table 5.9 Air Monitoring Station for Contract no. HY/2009/15
Table 5.10 Air Monitoring Stations for
Contract no. HY/2009/19
Table 5.11 Water Monitoring Stations for contracts
with respect to remaining DP3
work areas after the completion of
DP5 & DP6 in 2012 and intake diversion in 2013
Table 5.12 Water
Monitoring Stations for Contract no. HK/2009/01
Table 5.13 Water
Monitoring Stations for Contract no. HK/2009/02
Table 5.14 Water
Monitoring Stations for Contract no. HK/2010/06
Table 5.15 Water
Monitoring Stations for Contract no. HY/2009/15
Table 5.16 Water
Monitoring Stations for Contract no. HY/2009/19
Table 5.17 Summary
of Water Quality Monitoring Exceedances in Reporting Month
Table 5.18 Summary
of Enhanced Dissolved Oxygen Monitoring Exceedances in Reporting Month
Table 5.19 Details of Waste Disposal for Contract no. HK/2009/01
Table 5.20 Details of Waste Disposal for Contract no. HK/2009/02
Table 5.21 Details of Waste Disposal for Contract no. HY/2009/15
Table 5.22 Details of Waste Disposal for Contract no. HK/2010/06
Table 5.23 Details
of Waste Disposal for Contract no. HY/2009/19
Table 5.24 Details
of Waste Disposal for Contract no. HK/2012/08
Table 5.25 Details of Waste Disposal for Contract
no. HY/2010/08
Table 8.1 Summary
of Environmental Inspections for Contract no. HK/2009/01
Table 8.2 Summary
of Environmental Inspections for Contract no. HK/2009/02
Table 8.3 Summary
of Environmental Inspections for Contract no. HY/2009/15
Table 8.4 Summary
of Environmental Inspections for Contract no. HK/2010/06
Table 9.1 Cumulative Statistics on Complaints
Table 9.2 Cumulative Statistics on Successful Prosecutions
Table 10.1 Construction Activities and Recommended Mitigation
Measures in Coming Reporting Month
lIST OF FIGUREs
Figure 2.2 Project Organization Chart
Figure 2.3 Locations of Environmental Monitoring Stations
lIST OF APPENDIces
Appendix 3.1 Environmental Mitigation Implementation Schedule
Appendix 4.1 Action and Limit Level
Appendix 4.2 Copies of Calibration Certificates
Appendix 5.1 Monitoring Schedule for Reporting Month and Coming month
Appendix 5.2 Noise Monitoring Results and Graphical Presentations
Appendix 5.3 Air Quality Monitoring Results and Graphical Presentations
Appendix 5.4 Water Quality Monitoring Results and Graphical Presentations
Appendix 5.4a Additional Dissolved Oxygen Monitoring Results
Appendix 5.5 Real-time Noise Monitoring Results and Graphical Presentations
Appendix 6.1 Event Action Plans
Appendix
6.2 Summary for Notification of
Exceedance
Appendix 8.1 Construction Programme of Individual Contracts
Construction Activities for the Reported Period
Marine Works (at Wan Chai)
¡P
Rockfilling at the northern part of HKCEC3E (Ease
of HKCEC) between CH290 and CH385
¡P
Dewatering for Bay 8.
¡P
Pre-drilling work for steel bridge on the top of
temporary open channel along
¡P
3 nos. out of 4 nos. drill holes for LSD D-wall in
stage 3.
¡P
Changed over of P7 and P9 pumping station by
others. Placing ice and pumping of water to intake area.
Cross-Harbour Watermains
Installation (CHA & CHB) and Marine Works (at TST)
¡P
All defects were rectified and Stage 2 /3
connection.
¡P
Damaged isolation joints were replaced on 17 Aug.
2013. However, additional anode maybe required since there was still electrical
contamination between the new pipe and existing pipeline.
XHWM, Cooling Watermains,
Salt Watermains and Sewer (On Land)
¡P
Pipework for Additional Washout Chamber at VIP
drop-off. Reinstatement works at B6-2B at Northwest of HKCEC. Reinstatement of
roadworks at West Foyer of HKCEC. Planter reinstatement, kerbworks, hard
paving.
¡P
Cooling main works in Zone C1-2.
¡P
Salt watermain laying works in Zone A1-5C. Salt
watermain laying works in Zone A3-5C. Salt watermain laying works in Zone A3-1,
A5-2. Salt watermain laying works in A4-1B, 2B.
¡P
Relocation works of fire hydrant in Zone X2-1.
¡P
Temporary ducting and cabling works at junction
between
Tunnel Works
¡P
Installation of pre-bored H-pile in CWB Stage 2
Atrium Link (from CH120 to CH220).
23 nos. pre-bored H-piles had been excavated. 6 nos. pre-bored H-piles.
¡P
Construction of Common D-wall. Works was slow until
BC cutter back on site.
¡P
Filling of the existing open water channel from CH100
to CH206.
¡P
Demolition of the Promenade Deck , delayed by MOE
matters.
¡P
ELS at bottom-up area. Fabrication of steel strutting members ..
E & M
¡P
Operation attendance at Pumping Stations of 60
days.
¡P
Modification of existing covered walkway along
¡P
The full commissioning of P7, P8 and P9 cooling
water system.
¡P
The 60 days for T&C period of P9 cooling water
system.
¡P
Backfilling works for the trench of P7 and P8
cooling water system remedial works area.
¡P
Fresh water pipeworks had been completely laid to
P7, P8 and P9 Cooling Water Pumping Station.
¡P
Demolish of abandoned P8 Cooling Water Pumping
Station.
¡P
Installation of stoplog and its leakage test in SWIC.
¡P
Installation of Aeration and Chlorination Pipes at
¡P
The lower part of the wall for proposed wash out
chamber near CHS8A160.The fabrication works for DN800 temporary discharge pipe on
Site.
¡P
All DN800 watermains at
¡P
The excavation works at the Y-section connecting
with the existing DN600 watermains at
¡P
The remaining ABWF works and boundary wall in WSD
Salt Water Pumping Station , including maintenance platform and external
finishes.
¡P
The water plug at Bay5 / Bay 6 interface and the
subsequent dewatering.
¡P
Sheet pile cutting works between Bay 5 and Bay 6.
¡P
The formwork erection for the base slab at Bay 5
and the rebar fixing .
¡P
Construction of stoplog chamber extension at Bay 6.
¡P
The modification work for both east and west wings
of staircase ST-01 landing. Installation of glass panels for the disabled lift.
¡P
Excavation for the 6 nos. Temporary Covered Walkway
in the vicinity of Ferry Pier and their blinding layer.
¡P
The road modification works along
¡P
Breaking up the existing pavement and disposal for
extract sheetpile next to ECO gas filling station.
¡P
Removing the extract sheetpile between ECO gas fill
station and
¡P
Pavement works at
¡P
Rockfilling by Grade 400 and Grade 200 at WCR4/TWCR4,
all rockfilling works. Leveling stone installation along the temporary seawall.
¡P
Seawall blocks installation at WCR4/TWCR4.
¡P
Construction of EVA
¡P
Pre-cast installation support works
¡P
Road works at
¡P
D-wall and Barrette Construction
¡P
Construction works for Box Culvert T1
¡P
Construction works for Box Culvert U1
¡P
Demolition of parapet at IEC Link
¡P
Removal of marine platform
¡P
Construction of pile cap, column & cross head
(Marine)
¡P
Installation of dewatering well
¡P
Laying of 1500f pipe
¡P
Launching of segments
¡P
Extraction of temporary pile from marine section
¡P
Installation of temporary lighting at IEC link
commenced
¡P
Construction of bridge truss TA1 commenced
¡P
Breaking of barrette piles at Cut & Cover
tunnel commenced
¡P
Demolition of parapet at IEC link
¡P
Site preparation works
¡P
Site survey
¡P
ELS for box culvert La at
¡P
Dredging
¡P
Demolition of the existing
Noise
Monitoring
Real-time
Noise Monitoring
Air Quality Monitoring
Water Quality Monitoring
Table I Summary
of Water Quality Monitoring Exceedances in Reporting Month
Water Monitoring Station |
Mid-flood |
Mid-ebb |
|||||||||||
DO |
Turbidity |
SS |
DO |
Turbidity |
SS |
||||||||
|
LL |
|
LL |
|
LL |
|
LL |
|
LL |
|
LL |
||
WSD19 |
0 |
0 |
0 |
1 |
0 |
1 |
0 |
0 |
0 |
1 |
0 |
0 |
|
|
C1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
P1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
P3 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
P4 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
P5 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
HK/2009/02 |
C5e |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
C5w |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Monitoring started on 8 Feb 2012 |
WSD21 |
0 |
0 |
0 |
0 |
0 |
0 |
6 |
0 |
0 |
0 |
1 |
1 |
WSD9 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
WSD17 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Monitoring started on 29 July 2013 |
RW21-P789 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
HY/2009/15 |
C7 |
2 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Total |
2 |
0 |
0 |
1 |
0 |
1 |
6 |
0 |
0 |
1 |
1 |
1 |
- WSD9 and WSD17 were implemented with respect to HK/2009/02 from 8 Feb 2012.
- 4-week water quality monitoring at
WSD9, WSD10, WSD15, WSD17, C8 and C9 were completed on 6 Feb 2012.
- C8 and C9 were implemented with
respect to HY/2009/19 from 28 Jan 2012.
- C8 & C9 was temporary
suspended on 30 March 2013 due to the marine works for Contract no. HY/2009/19
had been completed on 4 March 2013
- WSD7 and WSD20 water quality
monitoring were temporarily suspended from 27 Apr 2012.
Table
II Summary of Enhanced Dissolved
Oxygen Monitoring Exceedances in Reporting Month
Contract no. |
Water Monitoring Station |
Mid-flood |
Mid-ebb |
||
DO |
DO |
||||
|
LL |
|
LL |
||
C6 |
0 |
0 |
1 |
0 |
|
C7 |
2 |
0 |
2 |
0 |
|
Ex-WPCWA SW |
0 |
4 |
0 |
2 |
|
Ex-WPCWA SE |
2 |
4 |
1 |
1 |
|
Total |
4 |
8 |
4 |
3 |
Complaints, Notifications of Summons and Successful
Prosecutions
Site Inspections and Audit
Contract no. HK/2009/01 ¡V Wan Chai Development
Phase II ¡V Central ¡VWanchai Bypass at HKCEC
Marine Works
¡P
Filling works up to +4.0mPD between CH290 to CH370.
¡P
Pre-bored H-pile footing at south side for
construction of steel bridge over temporary open channel between CH220 and
CH260 and Steel structure.
¡P
Reinstatement of existing seawall at
¡P
Construction of RC structure proposed box culvert
Bay 8 and Bay 9.
¡P
Backfilling to temporary water channel for
subsequent demolition of promenade deck and pumping station at HKCEC Water
Channel.
Cross-Harbour Watermains
Installation (CHA & CHB) and Marine Works at TST
¡P
Connection of Pipeline C to exiting mains at Wan
Chai .
¡P
Connection of Pipeline F to exiting mains at TST.
¡P
Disconnection and capping to existing mains at TST
.
XHWM, Cooling Watermains,
Salt Watermains and Sewer (On Land)
¡P
XHWM-Stage 4.
¡P
Additional Washout Chamber at VIP drop-off.
¡P
Reinstatement works at B6-2A and B6-3 at Northwest
of HKCEC.
¡P
Reinstatement of roadworks at B6-4 West Foyer of
HKCEC.
¡P
Works at Zone A1-5C, A1-5A2 and A3-5C.
¡P
Mainlaying works at A1-5C .
¡P
Mainlaying works at Zone A5-5, A5-2, A4-2B, A1-5A2.
¡P
Advance works for mainlaying works in Zone C1-2.
¡P
Mainlaying works at Zone X2-1 when instruction from
the Engineer.
¡P
Temporary ducting and cabling works at junction
between
¡P
Temporary ducting and cabling works at junction
between
Tunnel Works
¡P
Installation of pre-bored H-pile in CWB Stage 2
Atrium, Link.
¡P
Filling of the existing open water channel and
Dome.
¡P
Construction of the south Common D-wall.
¡P
Demolition of the Promenade Deck.
¡P
ELS for Stage 1 CWB.
Contract no. HK/2009/02 ¡V Wan Chai Development
Phase II ¡V Central ¡V Wan Chai Bypass at Wan Chai East
¡P
T&C period of P7, P8 & P9 cooling water
system.
¡P
Remedial works for P8 discharge mains at
¡P
Installation of outstanding VSD parts for P7 Cooling
Water Pumping Station.
¡P
The temp EVA construction for P7, P8 and P9 Cooling
Water Pumping Stations and satisfactorily passing FSD¡¦s inspection, ready to
handover to the stakeholders.
¡P
Installation of aeration and chlorination pipes at
Salt Water Intake Culvert (SWIC).
¡P
All DN800 salt watermains (CHS
¡P
SWIC accepted by WSD and complete removal of temporary
bulkhead for commencement of wet test of the WSD Salt Water Pumping Station.
¡P
Installation of temporary discharge pipe near CHS
¡P
Facade works for the boundary wall of WSD Salt
Water Pumping Station.
¡P
Construction of Bay 5 and all defeat rectification
works in Box Culvert N1.
¡P
Stop log installation at Bay 6.
¡P
Handing over inspection with DSD and connecting the
completed Box Culvert N1 with the existing drainage system.
¡P
Installation
¡P
ABWF works in Ferry Pier.
¡P
Installation of movable ramp system, plumbing
system and disabled lift.
¡P
Canopy installation on Observation Deck.
¡P
Curtain wall (glass) installation.
¡P
Energization of Ferry Pier by HEC.
¡P
Commence most of the T&C for E&M installation
at Ferry Pier
¡P
The footing for the cover walkway (Grid 1 ¡V Grid 4)
and commence EVA construction extending from P7 Cooling Water Pumping Station
to the Ferry Pier.
¡P
Removal of existing Contractor¡¦s establishment at
Area 9 and Area
¡P
Remaining reclamation works at WCR2 after
abandonment of existing P8 Cooling Water Pumping Station.
¡P
Seawall block & geotextile installation and
filling works for WCR4/TWCR4 reclamation.
¡P
Backfilling and road reinstatement works at Hung
Hing Road & Wan Shing Street for successful implementation of HHR Flyover
Diversion (Stage 1).
Contract no. HY/2009/15 ¡V Central-Wanchai Bypass ¡V
Tunnel (
Contract no. HK/2010/06 ¡V Wan Chai Development
Phase II ¡V Central ¡V Wan Chai Bypass over MTR Tsuen Wan Line
¡P
Sheet piling works
Contract no. HY/2009/19- Wan Chai Bypass Tunnel
(North Point Section) and Island Eastern Corridor Link
¡P
Road works at
¡P
D-wall and Barrette Construction
¡P
Construction works for Box Culvert T1
¡P
Construction works for Box Culvert U1
¡P
Demolition of parapet at IEC Link
¡P
Removal of marine platform
¡P
Construction of pile cap, column & cross head
(Marine)
¡P
ELS for Cut & Cover Tunnel
¡P
Installation of dewatering well
¡P
Laying of 1500f pipe
¡P
Launching of segments
¡P
Extraction of temporary pile from marine section
¡P
Installation of temporary lighting at IEC link
¡P
Construction of bridge truss TA1
¡P
Breaking of barrette piles at Cut & Cover
tunnel
¡P
Demolition of parapet at IEC link
Contract
no. HK/2012/08 ¡V Wan Chai Development Phase II ¡V Central- Wan Chai Bypass at Wan
Chai West
¡P
Site survey
¡P
Dredging
¡P
Demolition of the existing
¡P
ELS for box culvert La at
Contract no.
HY/2010/08 ¡VCentral - Wan Chai Bypass (CWB) ¡VTunnel (Slip Road 8)
¡P
Nil
1.1.1. Lam
Geotechnics Limited (LGL) has been appointed to work as the Environmental Team
(ET) under Environmental Permit no. EP-356/2009 and Further Environmental
permit nos. FEP-02/356/2009, FEP-03/356/2009, FEP-04/356/2009, FEP-05/356/2009,
FEP-06/356/2009 and FEP-07/356/2009 to implement the Environmental Monitoring and Audit
(EM&A) programme as stipulated in the EM&A Manual of the approved
Environmental Impact Assessment (EIA) Report for Wan Chai Development phase II
and Central-Wan Chai Bypass (Register No.: AEIAR-125/2008) and in the EM&A
Manual of the approved EIA Report for Central-Wan Chai Bypass and Island
Eastern Corridor Link (Register No. AEIAR-014/2001).
1.1.2. This
report presents the environmental monitoring and auditing work carried out in
accordance to the Section 10.3 of EM&A Manual and ¡§Environmental
Monitoring and Audit Requirements¡¨ under Particular Specification Section
27.
1.1.3. This
report documents the finding of EM&A works for Environmental Permit no.
EP-356/2009, Further Environmental Permit no. FEP-02/356/2009, FEP-03/356/2009,
FEP-04/356/2009, FEP-05/356/2009, FEP-06/356/2009 and FEP-07/356/2009 during the
period of July 2013 to August 2013. The cut-off date of reporting is at 27th
of each reporting month.
Section 1 Introduction ¡V details the scope and structure of the report.
Section 2 Project
Background ¡V summarizes background and
scope of the project, site description, project organization and contact
details of key personnel during the reporting period.
Section 3 Status of Regulatory Compliance ¡V summarizes the status of valid Environmental Permits /
Licenses during the reporting period.
Section 4 Monitoring
Requirements ¡V summarizes all monitoring
parameters, monitoring methodology and equipment, monitoring locations,
monitoring frequency, criteria and respective event and action plan and
monitoring programmes.
Section 5 Monitoring
Results ¡V summarizes the monitoring
results obtained in the reporting period.
Section 6 Compliance Audit ¡V summarizes
the auditing of monitoring results, all exceedances environmental
parameters.
Section 7 Cumulative Construction Impact due
to the Concurrent Projects ¡V summarizes the relevant cumulative
construction impact due to the concurrent activities of the concurrent Projects.
Section 8 Site Inspection ¡V summarizes the findings of weekly site inspections
undertaken within the reporting period, with a review of any relevant follow-up actions within the reporting period.
Section 9 Complaints, Notification of
summons and Prosecution ¡V summarizes the cumulative statistics on
complaints, notification of summons and prosecution
Section 10 Conclusion
2.1.1. ¡§Wan Chai
Development phase II and Central-Wan Chai Bypass¡¨ and ¡§Central-Wan Chai Bypass
and Island Eastern Corridor Link¡¨ (hereafter called ¡§the Project¡¨) are Designed
Project (DP) under the Environmental Impact Assessment Ordinance (Cap. 499)
(EIAO). The Environmental Impact Assessment (EIA) Reports for Central-Wan Chai
Bypass and
2.1.2. The key
purpose of Wan Chai Development Phase II (WDII) is to provide land at Wan Chai
North and North Point for construction of the Central-Wan Chai Bypass and
Island Eastern Corridor Link (CWB). Land formed under the project will be
developed as a world-class waterfront promenade joining that at the new Central
waterfront for public enjoyment.
2.1.3. There is a
compelling and present need for the CWB to provide relief to the very congested
2.2.1. The
Project is located mainly in Wan Chai North,
2.2.2. The study
area encompasses existing developments along the Wan Chai,
2.2.3. The scope of the Project comprises:
¡P
Land
formation for key transport infrastructure and facilities, including the Trunk
Road (i.e.
CWB) and the associated slip roads for connection to the Trunk Road and for through
traffic from Central to Wan Chai and Causeway Bay. The land formed for the above
transport infrastructure will provide opportunities for the development of an
attractive waterfront promenade for the enjoyment of the public
¡P
Reprovisioning
/ protection of the existing facilities and structures affected by the land
formation works mentioned above
¡P
Extension,
modification, reprovisioning or protection of existing storm water drainage
outfalls, sewerage outfalls and watermains affected by the revised land use and
land formation works mentioned above
¡P
Upgrading
of hinterland storm water drainage system and sewerage system, which would be
rendered insufficient by the land formation works mentioned above
¡P
Provision
of the ground level roads, flyovers, footbridges, necessary transport
facilities and the associated utility services
¡P
Construction
of the new waterfront promenade, landscape works and the associated utility services
¡P
The
Trunk Road (i.e. CWB) within the study area and the associated slip roads for
connection to the Trunk Road.
2.2.4. The
project also contains various Schedule 2 DPs that, under the EIAO, require
Environmental Permits (Eps) to be granted by the DEP before they may be either
constructed or operated. Table 2.1 summarises the five individual
DPs under this Project. Figure 2.1 shows the
locations of these Schedule 2 DPs.
Table 2.1 Schedule
2 Designated Projects under this Project
Item |
Designated
Project |
EIAO
Reference |
Reason for
inclusion |
DP1 |
Central-Wanchai Bypass (CWB) including its road tunnel and slip roads |
Schedule 2, Part I, A.1 and A.7 |
Trunk road and road tunnel more than 800 m in length |
DP2 |
Road P2 and other roads which are classified as primary/district
distributor roads |
Schedule 2, Part I, A.1 |
Primary / district distributor roads |
DP3 |
Reclamation works including associated dredging works |
Schedule 2, Part I, C.1 and C.12 |
Reclamation more than 5 ha in size and a dredging operation less than
100 m from a seawater intake point |
DP5 |
Wan Chai East Sewage Outfall |
Schedule 2, Part I, F.5 and F.6 |
Submarine sewage pipelines with a total diameter more than 1,200 mm
and include a submarine sewage outfall |
DP6 |
Dredging for the Cross-harbour Water Mains from Wan Chai to Tsim Sha
Tsui |
Schedule 2, Part I, C.12 |
A dredging operation less than 100 m from a seawater intake point |
2.3.1. Due to the
multi-contract nature of the Project, there are a number of contracts
sub-dividing the whole works area into different work areas to be commenced.
Contractors of individual contracts will be required by the EP holder to apply
Further Environmental Permits (FEP) such that the impact monitoring stations
are sub-divided accordingly to facilitate the implementation of EM&A
programme and to streamline the EM&A reporting for individual FEP holders
correspondingly.
2.3.2. The
details of individual contracts are summarized in Table 2.2.
Table 2.2 Details
of Individual Contracts under the Project
Contract
No. |
Contract Title |
Associated
DP(s) |
Construction
Commencement Date |
HK/2009/01 |
Wan Chai Development Phase II ¡V Central ¡VWanchai Bypass at |
DP3, DP6 |
23 July 2010 |
DP1, DP2 |
25 August 2011 |
||
HK/2009/02 |
Wan Chai Development Phase II ¡V Central ¡V Wan Chai Bypass at WanChai
East |
DP3, DP5 |
5 July 2010 |
DP1 |
26 April 2011 |
||
HY/2009/11 |
Wan Chai Development Phase II and Central ¡V Wan Chai Bypass ¡V North
Point Reclamation |
DP3 |
17 March 2010 |
HY/2009/15 |
Central-Wanchai Bypass ¡V Tunnel ( |
DP3 |
10 November 2010 |
DP1 |
13 July 2011 |
||
HK/2010/06 |
Wan Chai Development Phase II-Central-Wan Chai Bypass over MTR Tsuen
Wan Line |
DP3 |
22 March 2011 |
04/HY/2006 |
Reconstruction of Bus Terminus near |
DP1 |
September 2010 |
HY/2009/17 |
Central ¡V Wan Chai Bypass (CWB) at FEHD Whitfield Depot ¡V Advanced
piling works. |
DP1 |
5 October 2010 |
HY/2009/18 |
Central ¡V Wan Chai Bypass (CWB) ¡V Central Interchange |
DP1 |
21 April 2011 |
HY/2009/19 |
Central ¡V Wanchai Bypass Tunnel (North Point Section) and Island
Eastern Corridor Link |
DP1 |
24 March 2011 |
HK/2012/08 |
Wan Chai
Development Phase II Central- Wan Chai Bypass at
Wan Chai West |