Contract No: HK/2011/07 Wanchai
Development Phase II and Sampling, Field
Measurement and Testing Works (Stage 2) Environmental Permit no. EP-356/2009, Further Evironmental
permit nos. fep-02/356/2009, FEP-03/356/2009, Fep-04/356/2009 ,Fep-05/356/2009,
Fep-06/356/2009 and FEP-07/356/2009 Monthly Environmental Monitoring & Audit Report
- October 2013 -
|
CLIENTS: |
|
Civil Engineering and
Development Department and Highways Department |
Lam Geotechnics Limited 11/F Centre Point Wanchai, H.K. Telephone:
(852) 2882-3939 Facsimile:
(852) 2882-3331 E-mail:
info@lamenviro.com Website:
http://www.lamenviro.com |
|
|
|
|
|
Certified
by: |
|
Raymond
Dai Environmental
Team Leader |
|
DATE: |
|
November 2013 |
|
|
2.2 Scope of the Project and Site Description
2.3 Division of the Project Responsibility
2.4 Project Organization and Contact Personnel
3. Status of Regulatory Compliance
3.1 Status of Environmental Licensing and Permitting under
the Project
5.2 Real-time Noise Monitoring
6.2 Real-time noise Monitoring
6.5 Review of the Reasons for and the Implications of
Non-compliance
6.6 Summary of action taken in the event of and follow-up
on non-compliance
7. Cumulative Construction Impact due to the Concurrent
Projects
9. Complaints, Notification of Summons and Prosecution
lIST OF TABLES
Table I Summary of Water Quality Monitoring Exceedances in
Reporting Month
Table II Summary of Enhanced Dissolved Oxygen Monitoring
Exceedances in Reporting Month
Table 2.1 Schedule 2 Designated Projects under this Project
Table 2.2 Details of Individual Contracts under the Project
Table 2.3 Contact Details of Key Personnel
Table 3.4 Cumulative Summary of Valid Licences and Permits under
Contract no. HK/2009/01
Table 3.5 Summary of submission status under FEP-02/356/2009
Condition
Table 3.6 Cumulative Summary of Valid Licences and Permits under
Contract no. HK/2009/02
Table 3.7 Summary of submission status under FEP-03/356/2009
Condition
Table 3.8 Cumulative Summary of Valid Licences and Permits under
Contract no. HY/2009/15
Table 3.9 Summary of submission status under FEP-04/356/2009
Condition
Table 3.10 Cumulative Summary of Valid Licences and Permits under
Contract no. HK/2010/06
Table 3.11 Summary of submission status under EP-356/2009 and
FEP-05/356/2009 Condition
Table 3.12 Cumulative Summary of Valid Licences and Permits under
Contract no. HY/2009/19
Table 3.13 Cumulative Summary of Valid
Licences and Permits under Contract no. HK/2012/08
Table 3.14 Summary of submission status
under EP-356/2009 and FEP-06/356/2009 Condition
Table 3.15 Cumulative Summary of Valid
Licences and Permits under Contract no. HY/2010/08
Table 3.16 Summary of submission status under EP-356/2009 and FEP-07/356/2009 Condition
Table 4.1 Noise Monitoring Station
Table 4.2 Real Time Noise Monitoring Station
Table 4.3 Air Monitoring Station
Table 4.4 Marine Water Quality Stations for Water Quality
Monitoring
Table 4.5 Marine Water Quality Monitoring Frequency and
Parameters
Table 4.6 Marine Water Quality Stations for Enhanced Water
Quality Monitoring
Table 4.7 Marine Water Quality Stations for Additional DO
Monitoring
Table 5.2 Noise Monitoring Station for Contract nos. HK/2009/01,
HK/2009/02 and HK/2010/06
Table 5.3 Noise Monitoring Station for Contract no. HY/2009/15
Table 5.4 Noise Monitoring Station for Contract no. HY/2009/19
Table 5.5 Real Time Noise Monitoring Station for Contract no.
HY/2009/19
Table
5.7 Air Monitoring Station for Contract no.
HK/2009/01
Table 5.8 Air Monitoring Station for Contract no. HK/2009/02
Table 5.9 Air Monitoring Station for Contract no. HY/2009/15
Table 5.10 Air
Monitoring Stations for Contract no. HY/2009/19
Table 5.11 Water Monitoring Stations for contracts
with respect to remaining DP3
work areas after the completion of DP5 & DP6 in 2012 and intake diversion in 2013
Table 5.12 Water
Monitoring Stations for Contract no. HK/2009/01
Table 5.13 Water
Monitoring Stations for Contract no. HK/2009/02
Table 5.14 Water
Monitoring Stations for Contract no. HK/2010/06
Table 5.15 Water
Monitoring Stations for Contract no. HY/2009/15
Table 5.16 Water
Monitoring Stations for Contract no. HY/2009/19
Table 5.17 Summary
of Water Quality Monitoring Exceedances in Reporting Month
Table 5.18 Summary
of Enhanced Dissolved Oxygen Monitoring Exceedances in Reporting Month
Table 5.19 Details of Waste Disposal for Contract no. HK/2009/01
Table 5.20 Details of Waste Disposal for Contract no. HK/2009/02
Table 5.21 Details of Waste Disposal for Contract no. HY/2009/15
Table 5.22 Details of Waste Disposal for Contract no. HK/2010/06
Table 5.23 Details
of Waste Disposal for Contract no. HY/2009/19
Table 5.24 Details
of Waste Disposal for Contract no. HK/2012/08
Table 5.25 Details of Waste Disposal for Contract
no. HY/2010/08
Table 8.1 Summary
of Environmental Inspections for Contract no. HK/2009/01
Table 8.2 Summary
of Environmental Inspections for Contract no. HK/2009/02
Table 8.3 Summary
of Environmental Inspections for Contract no. HY/2009/15
Table 8.4 Summary
of Environmental Inspections for Contract no. HK/2010/06
Table 8.5 Summary
of Environmental Inspections for Contract no. HK/2012/08
Table 8.6 Summary
of Environmental Inspections for Contract no. HY/2010/08
Table 9.1 Cumulative Statistics on Complaints
Table 9.2 Cumulative Statistics on Successful Prosecutions
Table 10.1 Construction Activities and Recommended Mitigation
Measures in Coming Reporting Month
lIST OF FIGUREs
Figure 2.2 Project Organization Chart
Figure 4.1 Locations of Environmental Monitoring Stations
lIST OF APPENDIces
Appendix 3.1 Environmental Mitigation Implementation Schedule
Appendix 4.1 Action and Limit Level
Appendix 4.2 Copies of Calibration Certificates
Appendix 5.1 Monitoring Schedule for Reporting Month and Coming month
Appendix 5.2 Noise Monitoring Results and Graphical Presentations
Appendix 5.3 Air Quality Monitoring Results and Graphical Presentations
Appendix 5.4 Water Quality Monitoring Results and Graphical Presentations
Appendix 5.4a Additional Dissolved Oxygen Monitoring Results
Appendix 5.5 Real-time Noise Monitoring Results and Graphical Presentations
Appendix 6.1 Event Action Plans
Appendix
6.2 Summary for Notification of
Exceedance
Appendix 10.1 Construction Programme of Individual Contracts
Construction Activities for the Reported Period
Marine Works (at Wan Chai)
ˇP
Rock filling up to +4.2 mPD for D-wall
construction.
ˇP
Bottom slab of Bay 8. Preparation work for blinding
layer at Bay 9. Water leakage was found and re-grouting.
ˇP
Fabrication work for steel bridge on the top of
temporary open channel along
ˇP
Pre-drilling for D-walls at Area 8 (interface wall,
bulkhead).
ˇP
Ground treatment work and guide wall construction.
XHWM, Cooling Watermains,
Salt Watermains and Sewer (On Land)
ˇP
Design of the additional anode between the new pipe
and existing pipeline.
ˇP
Reinstatement works at HKCEC north & northwest.
Reinstatement works at West Foyer of HKCEC. Planter reinstatement, kerbworks,
hard paving and all other minor reinstatement works.
ˇP
Cooling main works in Zone C1-2. Cooling main works
along
ˇP
Salt watermain laying works along west of
Convention Avenue, J/O Convention Avenue & Fenwick Per Street, Harbour Road
in Zone A3-5C, A3-1, A3-5B, A2-4A, A5-5 and A5-2. Salt watermain laying works
along west of
ˇP
Relocation works of fire hydrant in Zone X2-1.
ˇP
Temporary ducting and cabling works at junction
between
Tunnel Works
ˇP
Installation of pre-bored H-pile in CWB Stage 2
Atrium Link (from CH120 to CH220).
ˇP
Construction of the Common D-wall.
ˇP
Filling of the existing open water channel from
CH100 to CH206.
ˇP
Demolition of the Promenade Deck. Installation of
sheet pile for demolition of P5 Pump house.
ˇP
ELS work at bottom-up area. Fabrication of steel
strutting members. Installation of ELS.
ˇP
Modification of existing covered walkway along
ˇP
60-Day Trial Operation for P7 Cooling Water Pumping
Station.
ˇP
Fire Certificate for all P7, P8 and P9 Cooling
Water Pumping Stations.
ˇP
Leakage rectification works for P8 discharge mains
near Gate No.1.
ˇP
The DN150 washout pipe testing under VO No.114
located at CHS8A230m. All necessary fittings and ready for gate valve
installation by WSD.
ˇP
Pressure test to Y-Section for connection with the
existing DN600 pipe at
ˇP
The remaining ABWF works and boundary wall in WSD
Salt Water Pumping Station, including maintenance platform and external
finishes.
ˇP
Bulkhead Removal at Bay 5 and Bay 6.
ˇP
The guiderail installation at stoplog chambers at
Bay 6.
ˇP
The remedial works at Bay 3 and Bay 6.
ˇP
Revised certified ELS design for modifying the
existing ELS for the construction of Manhole No. FRP-N-MH2.
ˇP
The 6nos. Temporary Covered Walkway in the vicinity
of Ferry Pier .
ˇP
Installation of base plates for seatings at Observation
Deck Level of Ferry Pier.
ˇP
Remedial works for the Eastern Bulkhead Wall.
ˇP
The road modification works along
ˇP
Pavement works at
ˇP
Backfilling works at
ˇP
Sorted public fill at WCR4/TWCR4.
ˇP
Seawall blocks installation at WCR4/TWCR4.
ˇP
Geotextile at WCR4/TWCR4 area.
ˇP
Construction of EVA
ˇP
Sheet piling works
ˇP
D-wall and Barrette Construction
ˇP
Removal of strut at ELS
ˇP
Construction works for Box Culvert T1
ˇP
Removal of marine platform
ˇP
Construction of pile cap, pier & cross head
(Marine)
ˇP
ELS and Cut & Cover Tunnel
ˇP
Installation of dewatering well
ˇP
Laying of 1500f pipe
ˇP
Launching of segments
ˇP
Extraction of temporary pile from marine section
ˇP
Construction of bridge truss TA1
ˇP
Demolition of parapet at IEC link
ˇP
Construction of King Post at ELS
ˇP
Site preparation works
ˇP
Site survey
ˇP
ELS for box culvert La at
ˇP
Dredging
ˇP
Preparation works for abandoning watermains at
Noise
Monitoring
Real-time
Noise Monitoring
Air Quality Monitoring
xv.
Due to electricity interruption, the 24hr TSP monitoring at CMA3a was
rescheduled from16 October 2013 to 17 October 2013.
Water Quality Monitoring
Table I Summary
of Water Quality Monitoring Exceedances in Reporting Month
Water Monitoring Station |
Mid-flood |
Mid-ebb |
|||||||||||
DO |
Turbidity |
SS |
DO |
Turbidity |
SS |
||||||||
|
LL |
|
LL |
|
LL |
|
LL |
|
LL |
|
LL |
||
WSD19 |
0 |
0 |
4 |
5 |
0 |
3 |
0 |
0 |
0 |
8 |
0 |
2 |
|
|
C1 |
0 |
0 |
1 |
0 |
0 |
0 |
2 |
0 |
1 |
0 |
0 |
0 |
|
P1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
P3 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
P4 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
P5 |
0 |
0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
HK/2009/02 Monitoring started on 8 Feb 2012 |
WSD21 |
3 |
3 |
1 |
1 |
0 |
4 |
4 |
3 |
2 |
0 |
0 |
1 |
WSD9 |
0 |
0 |
2 |
0 |
0 |
1 |
0 |
0 |
1 |
0 |
0 |
0 |
|
|
WSD17 |
0 |
0 |
2 |
2 |
0 |
0 |
0 |
2 |
1 |
0 |
0 |
0 |
Monitoring started on 29 July 2013 |
RW21-P789 |
0 |
0 |
1 |
3 |
0 |
0 |
0 |
0 |
1 |
1 |
0 |
0 |
HY/2009/15 |
C7 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
1 |
1 |
0 |
0 |
0 |
Total |
4 |
4 |
12 |
11 |
0 |
8 |
6 |
6 |
7 |
9 |
0 |
3 |
- WSD9 and WSD17 were implemented with respect to HK/2009/02 from 8 Feb 2012.
- 4-week water quality monitoring at
WSD9, WSD10, WSD15, WSD17, C8 and C9 were completed on 6 Feb 2012.
- C8 and C9 were implemented with
respect to HY/2009/19 from 28 Jan 2012.
- C8 & C9 was temporary
suspended on 30 March 2013 due to the marine works for Contract no. HY/2009/19
had been completed on 4 March 2013
- WSD7 and WSD20 water quality
monitoring were temporarily suspended from 27 Apr 2012.
Table
II Summary of Enhanced Dissolved
Oxygen Monitoring Exceedances in Reporting Month
Contract no. |
Water Monitoring Station |
Mid-flood |
Mid-ebb |
||
DO |
DO |
||||
|
LL |
|
LL |
||
C6 |
0 |
0 |
0 |
0 |
|
C7 |
2 |
1 |
5 |
0 |
|
Ex-WPCWA SW |
1 |
3 |
1 |
5 |
|
Ex-WPCWA SE |
7 |
2 |
1 |
6 |
|
Total |
10 |
6 |
7 |
11 |
Complaints, Notifications of Summons and Successful
Prosecutions
Site Inspections and Audit
Contract no. HK/2009/01 ˇV Wan Chai Development
Phase II ˇV Central ˇVWanchai Bypass at HKCEC
Marine Works
ˇP
Filling works up to +4.0mPD between CH360 to CH370.
ˇP
Construction of RC structure proposed box culvert
Bay 8 Wall and Bay 9 Base slab.
ˇP
D-wall construction at Stage 3.
ˇP
Outfall construction for discharge pipes at
Cooling Watermains, Salt
Watermains and Sewer (On Land)
ˇP
Salt watermain laying works would be continued
along west of
ˇP
Road advance works at the junction between Expo
Drive East & Expo Drive Central and nearby area.
ˇP
Cooling main laying works along
Tunnel Works
ˇP
Installation of pre-bored H-pile in CWB Stage 2
Atrium Link.
ˇP
Construction of the south Common D-wall.
ˇP
Advance works for demolition of the HKCEC Pump
home.
ˇP
ELS for Stage 1 CWB.
Contract no. HK/2009/02 ˇV Wan Chai Development
Phase II ˇV Central ˇV Wan Chai Bypass at Wan Chai East
ˇP
60-day trial operation of P7 cooling water system.
ˇP
Leakage rectification works for P8 discharge mains
at
ˇP
Flexible joint rectification works for P8 discharge
mains at CHBH
ˇP
Hatch box replacement for P7 intake mains.
ˇP
Butterfly valve dismantling works for P7, P8 and P9
system.
ˇP
All outstanding works for handing over P7, P8 and
P9 Cooling Water Pumping Stations.
ˇP
Connection with the existing DN600 salt watermains
at
ˇP
Water tightness test for Salt Water Intake Culvert.
ˇP
Removal of temporary bulkhead for commencement of
wet test of the WSD Salt Water Pumping Station.
ˇP
Outstanding works at WSD Salt Water Pumping
Station.
ˇP
Box Culvert N1 & Drain FRP-N and handed over to
DSD
ˇP
Drainage re-diversion from temp 1800 dia. drain to
the completed Box Culvert N1.
ˇP
ABWF works in Ferry Pier.
ˇP
Rectifying defects in movable ramp.
ˇP
Most of the individual T&C of E&M equipment
at Ferry Pier
ˇP
Installation works for FRP Enclosure at 1/F public
area, 2/F and staircase in Ferry Pier.
ˇP
Utility works and commence EVA construction
extending from P7 Cooling Water Pumping Station to the Ferry Pier.
ˇP
All outstanding interface coring for Eastern
Bulkhead for substantial completion of Section IXA of the Works.
ˇP
Filling works at WCR4/TWCR4 after abandonment of
existing temp 1800 dia. drain at WCR4.
ˇP
Backfilling and roadworks at Hung Hing Road &
Wan Shing Street for successful implementation of HHR Flyover Diversion (Stage
1) on 2 Nov 2013
Contract no. HY/2009/15 ˇV Central-Wanchai Bypass ˇV
Tunnel (
Contract no. HK/2010/06 ˇV Wan Chai Development
Phase II ˇV Central ˇV Wan Chai Bypass over MTR Tsuen Wan Line
ˇP
Sheet piling works
Contract no. HY/2009/19- Wan Chai Bypass Tunnel
(North Point Section) and Island Eastern Corridor Link
ˇP
D-wall and Barrette Construction
ˇP
Removal of strut at ELS
ˇP
Construction works for Box Culvert T1
ˇP
Removal of marine platform
ˇP
Construction of pile cap, pier & cross head
(Marine)
ˇP
ELS and Cut & Cover Tunnel
ˇP
Installation of dewatering well
ˇP
Laying of 1500f pipe
ˇP
Launching of segments
ˇP
Extraction of temporary pile from marine section
ˇP
Construction of bridge truss TA1
ˇP
Demolition of parapet at IEC link
ˇP
Construction of King Post at ELS
Contract
no. HK/2012/08 ˇV Wan Chai Development Phase II ˇV Central- Wan Chai Bypass at Wan
Chai West
ˇP
Dredging
ˇP
ELS for box culvert L at
ˇP
Works for abandoning watermains at
ˇP
Caisson seawall units installation and marine
filling
Contract no.
HY/2010/08 ˇVCentral - Wan Chai Bypass (CWB) ˇVTunnel (Slip Road 8)
ˇP
Nil
1.1.1. Lam
Geotechnics Limited (LGL) has been appointed to work as the Environmental Team
(ET) under Environmental Permit no. EP-356/2009 and Further Environmental
permit nos. FEP-02/356/2009, FEP-03/356/2009, FEP-04/356/2009, FEP-05/356/2009,
FEP-06/356/2009 and FEP-07/356/2009 to implement the Environmental Monitoring and Audit
(EM&A) programme as stipulated in the EM&A Manual of the approved
Environmental Impact Assessment (EIA) Report for Wan Chai Development phase II
and Central-Wan Chai Bypass (Register No.: AEIAR-125/2008) and in the EM&A
Manual of the approved EIA Report for Central-Wan Chai Bypass and Island
Eastern Corridor Link (Register No. AEIAR-014/2001).
1.1.2. This
report presents the environmental monitoring and auditing work carried out in
accordance to the Section 10.3 of EM&A Manual and ˇ§Environmental
Monitoring and Audit Requirementsˇ¨ under Particular Specification Section
27.
1.1.3. This
report documents the finding of EM&A works for Environmental Permit no.
EP-356/2009, Further Environmental Permit no. FEP-02/356/2009, FEP-03/356/2009,
FEP-04/356/2009, FEP-05/356/2009, FEP-06/356/2009 and FEP-07/356/2009 during the
period of September 2013 to October 2013. The cut-off date of reporting is at
27th of each reporting month.
Section 1 Introduction ˇV details the scope and structure of the report.
Section 2 Project
Background ˇV summarizes background and
scope of the project, site description, project organization and contact
details of key personnel during the reporting period.
Section 3 Status of Regulatory Compliance ˇV summarizes the status of valid Environmental Permits /
Licenses during the reporting period.
Section 4 Monitoring
Requirements ˇV summarizes all monitoring
parameters, monitoring methodology and equipment, monitoring locations,
monitoring frequency, criteria and respective event and action plan and
monitoring programmes.
Section 5 Monitoring
Results ˇV summarizes the monitoring
results obtained in the reporting period.
Section 6 Compliance Audit ˇV summarizes
the auditing of monitoring results, all exceedances environmental
parameters.
Section 7 Cumulative Construction Impact due
to the Concurrent Projects ˇV summarizes the relevant cumulative
construction impact due to the concurrent activities of the concurrent Projects.
Section 8 Site Inspection ˇV summarizes the findings of weekly site inspections
undertaken within the reporting period, with a review of any relevant follow-up actions within the reporting period.
Section 9 Complaints, Notification of
summons and Prosecution ˇV summarizes the cumulative statistics on
complaints, notification of summons and prosecution
Section 10 Conclusion
2.1.1. ˇ§Wan Chai
Development phase II and Central-Wan Chai Bypassˇ¨ and ˇ§Central-Wan Chai Bypass
and Island Eastern Corridor Linkˇ¨ (hereafter called ˇ§the Projectˇ¨) are Designed
Project (DP) under the Environmental Impact Assessment Ordinance (Cap. 499)
(EIAO). The Environmental Impact Assessment (EIA) Reports for Central-Wan Chai
Bypass and
2.1.2. The key
purpose of Wan Chai Development Phase II (WDII) is to provide land at Wan Chai
North and North Point for construction of the Central-Wan Chai Bypass and
Island Eastern Corridor Link (CWB). Land formed under the project will be
developed as a world-class waterfront promenade joining that at the new Central
waterfront for public enjoyment.
2.1.3. There is a
compelling and present need for the CWB to provide relief to the very congested
2.2.1. The
Project is located mainly in Wan Chai North,
2.2.2. The study
area encompasses existing developments along the Wan Chai,
2.2.3. The scope of the Project comprises:
ˇP
Land
formation for key transport infrastructure and facilities, including the Trunk
Road (i.e.
CWB) and the associated slip roads for connection to the Trunk Road and for through
traffic from Central to Wan Chai and Causeway Bay. The land formed for the above
transport infrastructure will provide opportunities for the development of an
attractive waterfront promenade for the enjoyment of the public
ˇP
Reprovisioning
/ protection of the existing facilities and structures affected by the land
formation works mentioned above
ˇP
Extension,
modification, reprovisioning or protection of existing storm water drainage
outfalls, sewerage outfalls and watermains affected by the revised land use and
land formation works mentioned above
ˇP
Upgrading
of hinterland storm water drainage system and sewerage system, which would be
rendered insufficient by the land formation works mentioned above
ˇP
Provision
of the ground level roads, flyovers, footbridges, necessary transport
facilities and the associated utility services
ˇP
Construction
of the new waterfront promenade, landscape works and the associated utility
services
ˇP
The
Trunk Road (i.e. CWB) within the study area and the associated slip roads for
connection to the Trunk Road.
2.2.4. The
project also contains various Schedule 2 DPs that, under the EIAO, require
Environmental Permits (Eps) to be granted by the DEP before they may be either
constructed or operated. Table 2.1 summarises the five individual
DPs under this Project. Figure 2.1 shows the locations of these Schedule 2 DPs.
Table 2.1 Schedule
2 Designated Projects under this Project
Item |
Designated
Project |
EIAO Reference
|
Reason for
inclusion |
DP1 |
Central-Wanchai Bypass (CWB) including its road tunnel and slip roads |
Schedule 2, Part I, A.1 and A.7 |
Trunk road and road tunnel more than 800 m in length |
DP2 |
Road P2 and other roads which are classified as primary/district
distributor roads |
Schedule 2, Part I, A.1 |
Primary / district distributor roads |
DP3 |
Reclamation works including associated dredging works |
Schedule 2, Part I, C.1 and C.12 |
Reclamation more than 5 ha in size and a dredging operation less than
100 m from a seawater intake point |
DP5 |
Wan Chai East Sewage Outfall |
Schedule 2, Part I, F.5 and F.6 |
Submarine sewage pipelines with a total diameter more than 1,200 mm
and include a submarine sewage outfall |
DP6 |
Dredging for the Cross-harbour Water Mains from Wan Chai to Tsim Sha
Tsui |
Schedule 2, Part I, C.12 |
A dredging operation less than 100 m from a seawater intake point |
2.3.1. Due to the
multi-contract nature of the Project, there are a number of contracts sub-dividing
the whole works area into different work areas to be commenced. Contractors of
individual contracts will be required by the EP holder to apply Further
Environmental Permits (FEP) such that the impact monitoring stations are
sub-divided accordingly to facilitate the implementation of EM&A programme
and to streamline the EM&A reporting for individual FEP holders
correspondingly.
2.3.2. The
details of individual contracts are summarized in Table 2.2.
Table 2.2 Details
of Individual Contracts under the Project
Contract
No. |
Contract Title |
Associated
DP(s) |
Construction
Commencement Date |
HK/2009/01 |
Wan Chai Development Phase II ˇV Central ˇVWanchai Bypass at |
DP3, DP6 |
23 July 2010 |
DP1, DP2 |
25 August 2011 |
||
HK/2009/02 |
Wan Chai Development Phase II ˇV Central ˇV Wan Chai Bypass at WanChai
East |
DP3, DP5 |
5 July 2010 |
DP1 |
26 April 2011 |
||
HY/2009/11 |
Wan Chai Development Phase II and Central ˇV Wan Chai Bypass ˇV North
Point Reclamation |
DP3 |
17 March 2010 |
HY/2009/15 |
Central-Wanchai Bypass ˇV Tunnel ( |
DP3 |
10 November 2010 |
DP1 |
13 July 2011 |
||
HK/2010/06 |
Wan Chai Development Phase II-Central-Wan Chai Bypass over MTR Tsuen
Wan Line |
DP3 |
22 March 2011 |
04/HY/2006 |
Reconstruction of Bus Terminus near |
DP1 |
September 2010 |
HY/2009/17 |
Central ˇV Wan Chai Bypass (CWB) at FEHD Whitfield Depot ˇV Advanced
piling works. |
DP1 |
5 October 2010 |
HY/2009/18 |
Central ˇV Wan Chai Bypass (CWB) ˇV Central Interchange |
DP1 |
21 April 2011 |
HY/2009/19 |
Central ˇV Wanchai Bypass Tunnel (North Point Section) and Island
Eastern Corridor Link |
DP1 |
24 March 2011 |
HK/2012/08 |
Wan Chai
Development Phase II Central- Wan Chai Bypass at
Wan Chai West |
DP1,DP2,
DP3 |
5 March 2013 |
HY/2010/08 |
Central- Wanchai Bypass Tunnel ˇV Tunnel (Slip Road 8) |
DP1, DP2, DP3 |
21 March 2013 |
2.4.1. Civil
Engineering and Development Department and Highways Department are the overall
project controllers for the Wan Chai Development Phase II and Central-Wan Chai
Bypass respectively. For the construction phase of the Project, Project
Engineer, Contractor(s), Environmental Team and Independent Environmental
Checker are appointed to manage and control environmental issues.
2.4.2. The
proposed project organization and lines of communication with respect to
environmental protection works are shown in Figure 2.2. Key
personnel and contact particulars are summarized in Table 2.3:
Table
2.3 Contact Details of Key Personnel
Party |
Role |
Post |
Name |
Contact
No. |
Contact
Fax |
AECOM |
Engineerˇ¦s Representative for WDII |
Principal Resident Engineer |
Mr. Frankie Fan |
2587 1778 |
2587 1877 |
Engineerˇ¦s Representative for CWB |
Principal Resident Engineer |
Mr. Peter Poon |
3912 3388 |
3912 3010 |
|
Chun Wo ˇV Leader Joint Venture |
Contractor under Contract no. HK/2009/01 |
Joint
Venture Board Representative |
|
2162 9909 |
2587 1878 |
Deputy Site
Agent |
Mr Andy Yu |
9648 4896 |
|||
Construction
Manager |
Mr Terry
Wong |
9757 9846 |
|||
Construction
Manager |
Mr. Wyman
Wong |
9627 2467 |
|||
Construction
Manager |
Mr Kenneth
Chan |
9160 3850 |
|||
Environmental
Officer (Compliance Manager) |
Mr. Andy
Mak |
9103 2370 |
|||
Environmental
Supervisor |
Fan Chun
Wai |
6487 4488 |
|||
Chun Wo ˇV CRGL Joint Venture |
Contractor under Contract no. HK/2009/02 |
Project
Manager |
Mr. David
Lau |
3658-3022 |
2827 9996 |
Quality & Environmental Manager |
Mr. C.P. Ho |
9191 8856 |
|||
|
Contractor under Contract no. HY/2009/15 |
Project Director |
K C Cheung |
3557 6399 |
2566 2192 |
Site Manager |
J H Chen |
3557 6368 |
|||
|
|
Contractorˇ¦s Representative |
Andrew Wong |
3557 6358 |
|
|
|
Head of Construction Manager |
Roger Cheung |
3557 6371 |
|
|
|
Senior Construction Manager |
Gene Cheung |
3557 6395 |
|
|
|
Environmental Officer |
Mr. Daniel Sin |
3557 6347 |
|
Gammon -Leader JV |
Contractor under Contract no. HK/2010/06 |
Project
Manager |
Mr. Paul Lui |
9095 7922 |
2529 2880 |
Site Agent |
Mr. Eric
Yip |
2529 2068 |
|||