Contract No: HK/2011/07

 

Wanchai Development Phase II and Central Wanchai Bypass

Sampling, Field Measurement and Testing Works (Stage 2)

 

Environmental Permit no. EP-356/2009,

Further Evironmental permit nos. fep-02/356/2009, FEP-03/356/2009, Fep-04/356/2009 ,Fep-05/356/2009,  Fep-06/356/2009 and FEP-07/356/2009

 

Monthly Environmental Monitoring & Audit Report

 

- October 2013 -


CLIENTS:

PREPARED BY:

 

 

Civil Engineering and Development

Department

 

and

 

Highways Department

 

Lam Geotechnics Limited

 

11/F Centre Point

181-185 Gloucester Road,

Wanchai, H.K.

 

Telephone: (852) 2882-3939

Facsimile: (852) 2882-3331

E-mail: info@lamenviro.com

Website: http://www.lamenviro.com

 

 

 

 

 

Certified by:



 

 

 

 

 

                                               

Raymond Dai

Environmental Team Leader

 

 

 

DATE:

 

 

November 2013

 

 


Table of contents

 

EXECUTIVE SUMMARY. 4

1.     Introduction. 12

1.1        Scope of the Report 14

1.2        Structure of the Report 14

2.     Project Background. 16

2.1        Background. 16

2.2        Scope of the Project and Site Description. 16

2.3        Division of the Project Responsibility. 17

2.4        Project Organization and Contact Personnel 18

3.     Status of Regulatory Compliance. 23

3.1        Status of Environmental Licensing and Permitting under the Project 26

4.     Monitoring Requirements. 37

4.1        Noise Monitoring. 40

4.2        Air Monitoring. 41

4.3        Water Quality Monitoring. 44

5.     Monitoring Results. 50

5.1        Noise Monitoring Results. 50

5.2        Real-time Noise Monitoring. 51

5.3        Air Monitoring Results. 52

5.4        Water Monitoring Results. 54

5.5        Waste Monitoring Results. 61

6.     Compliance Audit. 65

6.1        Noise Monitoring. 67

6.2        Real-time noise Monitoring. 67

6.3        Air Monitoring. 67

6.4        Water Quality Monitoring. 68

6.5        Review of the Reasons for and the Implications of Non-compliance. 70

6.6        Summary of action taken in the event of and follow-up on non-compliance. 70

7.     Cumulative Construction Impact due to the Concurrent Projects. 70

8.     Environmental Site Audit. 71

9.     Complaints, Notification of Summons and Prosecution. 72

10.    Conclusion. 76


lIST OF TABLES

 

Table I         Summary of Water Quality Monitoring Exceedances in Reporting Month

Table II        Summary of Enhanced Dissolved Oxygen Monitoring Exceedances in Reporting Month

Table 2.1     Schedule 2 Designated Projects under this Project

Table 2.2      Details of Individual Contracts under the Project

Table 2.3      Contact Details of Key Personnel

Table 3.1      Summary of the current status on licences and/or permits on environmental protection pertinent to the Project

Table 3.4      Cumulative Summary of Valid Licences and Permits under Contract no. HK/2009/01

Table 3.5      Summary of submission status under FEP-02/356/2009 Condition

Table 3.6      Cumulative Summary of Valid Licences and Permits under Contract no. HK/2009/02

Table 3.7      Summary of submission status under FEP-03/356/2009 Condition

Table 3.8      Cumulative Summary of Valid Licences and Permits under Contract no. HY/2009/15

Table 3.9      Summary of submission status under FEP-04/356/2009 Condition

Table 3.10    Cumulative Summary of Valid Licences and Permits under Contract no. HK/2010/06

Table 3.11    Summary of submission status under EP-356/2009 and FEP-05/356/2009 Condition

Table 3.12    Cumulative Summary of Valid Licences and Permits under Contract no. HY/2009/19

Table 3.13    Cumulative Summary of Valid Licences and Permits under Contract no. HK/2012/08

Table 3.14    Summary of submission status under EP-356/2009 and FEP-06/356/2009 Condition

Table 3.15    Cumulative Summary of Valid Licences and Permits under Contract no. HY/2010/08

Table 3.16    Summary of submission status under EP-356/2009 and FEP-07/356/2009 Condition

Table 4.1      Noise Monitoring Station

Table 4.2      Real Time Noise Monitoring Station

Table 4.3      Air Monitoring Station

Table 4.4     Marine Water Quality Stations for Water Quality Monitoring

Table 4.5      Marine Water Quality Monitoring Frequency and Parameters

Table 4.6     Marine Water Quality Stations for Enhanced Water Quality Monitoring

Table 4.7     Marine Water Quality Stations for Additional DO Monitoring

Table 5.2     Noise Monitoring Station for Contract nos. HK/2009/01, HK/2009/02 and HK/2010/06

Table 5.3     Noise Monitoring Station for Contract no. HY/2009/15

Table 5.4     Noise Monitoring Station for Contract no. HY/2009/19

Table 5.5      Real Time Noise Monitoring Station for Contract no. HY/2009/19

Table 5.7    Air Monitoring Station for Contract no. HK/2009/01

Table 5.8     Air Monitoring Station for Contract no. HK/2009/02

Table 5.9     Air Monitoring Station for Contract no. HY/2009/15

Table 5.10    Air Monitoring Stations for Contract no. HY/2009/19

Table 5.11  Water Monitoring Stations for contracts with respect to remaining DP3

work areas after the completion of DP5 & DP6 in 2012 and intake diversion in 2013

Table 5.12    Water Monitoring Stations for Contract no. HK/2009/01

Table 5.13    Water Monitoring Stations for Contract no. HK/2009/02

Table 5.14    Water Monitoring Stations for Contract no. HK/2010/06

Table 5.15    Water Monitoring Stations for Contract no. HY/2009/15

Table 5.16    Water Monitoring Stations for Contract no. HY/2009/19

Table 5.17    Summary of Water Quality Monitoring Exceedances in Reporting Month

Table 5.18    Summary of Enhanced Dissolved Oxygen Monitoring Exceedances in Reporting Month

Table 5.19    Details of Waste Disposal for Contract no. HK/2009/01

Table 5.20    Details of Waste Disposal for Contract no. HK/2009/02

Table 5.21    Details of Waste Disposal for Contract no. HY/2009/15

Table 5.22    Details of Waste Disposal for Contract no. HK/2010/06

Table 5.23    Details of Waste Disposal for Contract no. HY/2009/19

Table 5.24    Details of Waste Disposal for Contract no. HK/2012/08

Table 5.25  Details of Waste Disposal for Contract no. HY/2010/08

Table 8.1     Summary of Environmental Inspections for Contract no. HK/2009/01

Table 8.2     Summary of Environmental Inspections for Contract no. HK/2009/02

Table 8.3     Summary of Environmental Inspections for Contract no. HY/2009/15

Table 8.4     Summary of Environmental Inspections for Contract no. HK/2010/06

Table 8.5     Summary of Environmental Inspections for Contract no. HK/2012/08

Table 8.6      Summary of Environmental Inspections for Contract no. HY/2010/08

Table 9.1      Cumulative Statistics on Complaints

Table 9.2      Cumulative Statistics on Successful Prosecutions

Table 10.1    Construction Activities and Recommended Mitigation Measures in Coming Reporting Month

 

 

lIST OF FIGUREs

 

Figure 2.1       Project Layout

Figure 2.2       Project Organization Chart

Figure 4.1     Locations of Environmental Monitoring Stations

 

 

 

lIST OF APPENDIces

 

Appendix 3.1  Environmental Mitigation Implementation Schedule

Appendix 4.1  Action and Limit Level

Appendix 4.2  Copies of Calibration Certificates

Appendix 5.1  Monitoring Schedule for Reporting Month and Coming month

Appendix 5.2  Noise Monitoring Results and Graphical Presentations

Appendix 5.3  Air Quality Monitoring Results and Graphical Presentations

Appendix 5.4  Water Quality Monitoring Results and Graphical Presentations

Appendix 5.4a  Additional Dissolved Oxygen Monitoring Results

Appendix 5.5  Real-time Noise Monitoring Results and Graphical Presentations

Appendix 6.1  Event Action Plans

Appendix 6.2  Summary for Notification of Exceedance

Appendix 9.1  Complaint Log

Appendix 10.1  Construction Programme of Individual Contracts


EXECUTIVE SUMMARY

  1. This is the Environmental Monitoring and Audit (EM&A) Monthly Report ˇVOctober 2013 for the Project of Wan Chai Development Phase II and Central-Wanchai Bypass under Environmental Permit no. EP-356/2009 and Further Environmental permit nos. FEP-02/356/2009, FEP-03/356/2009, FEP-04/356/2009, FEP-05/356/2009, FEP-06/356/2009 and FEP-07/356/2009. This report presents the environmental monitoring findings and information recorded during the period September 2013 to October 2013. The cut-off date of reporting is at 27th of each reporting month.

 

Construction Activities for the Reported Period

 

  1. During this reporting period, the major work activities for Contract no. HK/2009/01 included:

Marine Works (at Wan Chai)

ˇP          Rock filling up to +4.2 mPD for D-wall construction.

ˇP          Bottom slab of Bay 8. Preparation work for blinding layer at Bay 9. Water leakage was found and re-grouting.

ˇP          Fabrication work for steel bridge on the top of temporary open channel along Convention Avenue.

ˇP          Pre-drilling for D-walls at Area 8 (interface wall, bulkhead).

ˇP          Ground treatment work and guide wall construction.

XHWM, Cooling Watermains, Salt Watermains and Sewer (On Land)

ˇP          Design of the additional anode between the new pipe and existing pipeline.

ˇP          Reinstatement works at HKCEC north & northwest. Reinstatement works at West Foyer of HKCEC. Planter reinstatement, kerbworks, hard paving and all other minor reinstatement works.

ˇP          Cooling main works in Zone C1-2. Cooling main works along Expo Drive East and Fleming Road.

ˇP          Salt watermain laying works along west of Convention Avenue, J/O Convention Avenue & Fenwick Per Street, Harbour Road in Zone A3-5C, A3-1, A3-5B, A2-4A, A5-5 and A5-2. Salt watermain laying works along west of Convention Avenue near Grand Hyatt Hotel in Zone A1-5C, A1-5A3. 

ˇP          Relocation works of fire hydrant in Zone X2-1.

ˇP          Temporary ducting and cabling works at junction between Expo Drive East and Expo Drive Central.

Tunnel Works

ˇP          Installation of pre-bored H-pile in CWB Stage 2 Atrium Link (from CH120 to CH220).

ˇP          Construction of the Common D-wall.

ˇP          Filling of the existing open water channel from CH100 to CH206.

ˇP          Demolition of the Promenade Deck. Installation of sheet pile for demolition of P5 Pump house.  

ˇP          ELS work at bottom-up area. Fabrication of steel strutting members. Installation of ELS.

 

  1. During this reporting period, the major work activities for Contract no. HK/2009/02 included:

ˇP          Modification of existing covered walkway along Expo Drive East.

ˇP          60-Day Trial Operation for P7 Cooling Water Pumping Station.

ˇP          Fire Certificate for all P7, P8 and P9 Cooling Water Pumping Stations.

ˇP          Leakage rectification works for P8 discharge mains near Gate No.1.

ˇP          The DN150 washout pipe testing under VO No.114 located at CHS8A230m. All necessary fittings and ready for gate valve installation by WSD.

ˇP          Pressure test to Y-Section for connection with the existing DN600 pipe at Hung Hing Road had been completed.

ˇP          The remaining ABWF works and boundary wall in WSD Salt Water Pumping Station, including maintenance platform and external finishes.

ˇP          Bulkhead Removal at Bay 5 and Bay 6.

ˇP          The guiderail installation at stoplog chambers at Bay 6.

ˇP          The remedial works at Bay 3 and Bay 6.

ˇP          Revised certified ELS design for modifying the existing ELS for the construction of Manhole No. FRP-N-MH2.

ˇP          The 6nos. Temporary Covered Walkway in the vicinity of Ferry Pier .

ˇP          Installation of base plates for seatings at Observation Deck Level of Ferry Pier.

ˇP          Remedial works for the Eastern Bulkhead Wall.

Hung Hing Road Flyover Diversion (Stage 1):

ˇP          The road modification works along Wan Shing Street for HHR Flyover Diversion (Stage 1).

ˇP          Pavement works at Wan Shing Street next to SPCAˇ¦s Main Vehicular Access.

ˇP          Backfilling works at Wan Shing Street next to HEC station entrance. Pavement works.

ˇP          Sorted public fill at WCR4/TWCR4.

ˇP          Seawall blocks installation at WCR4/TWCR4.

ˇP          Geotextile at WCR4/TWCR4 area.

 

  1. During this reporting period, the major work activities for Contract no. HY/2009/15 included:

ˇP          Construction of EVA

                         

  1. During this reporting period, the major work activities for Contract no. HK/2010/06 included:

ˇP          Sheet piling works

 

  1. During this reporting period, the major work activities for Contract no. HY/2009/19 included:

ˇP          D-wall and Barrette Construction

ˇP          Removal of strut at ELS

ˇP          Construction works for Box Culvert T1

ˇP          Removal of marine platform

ˇP          Construction of pile cap, pier & cross head (Marine)

ˇP          ELS and Cut & Cover Tunnel

ˇP          Installation of dewatering well

ˇP          Laying of 1500f pipe

ˇP          Launching of segments

ˇP          Extraction of temporary pile from marine section

ˇP          Construction of bridge truss TA1

ˇP          Demolition of parapet at IEC link

ˇP          Construction of King Post at ELS

 

  1. During this reporting period, the major work activities for Contract no. HK/2012/08 included:

ˇP          Site preparation works

ˇP          Site survey

ˇP          ELS for box culvert La at Lung King Street

ˇP          Dredging

ˇP          Preparation works for abandoning watermains at Lung King Street

 

  1. During this reporting period, the no major work activities for Contract no. HY/2010/08 was conducted

 

 

Noise Monitoring

  1. Noise monitoring during daytime and restricted hour were conducted at the stations M1a, M2b, M3a, M4b, M5b and M6 on a weekly basis in the reporting month.
  2. No action and 2 limit level exceedances at M6 ˇV HK Baptist Church Henrietta Secondary School were recorded on 3 and 16 October 2013 in this reporting month. The exceedances were concluded as non-project related.

 

Real-time Noise Monitoring

  1. As the land-based piling and filling works- DP3 at Tin Hau had been completed on 3 September 2012 and confirmed by RSS, the real-time noise monitoring results at FEHD Hong Kong Transport Section Whitfield Depot was excluded under EP-356/2009 since 28 November 2012.
  2. The real-time noise monitoring at RTN2-Oil Street Community Liaison Centre has been relocated to City Garden Electric Centre (RTN2a- Electric Centre) on 5 Oct 2012, which is a representative of noise sensitive receiver- City Garden. The baseline noise level of RTN2a will adopt the results derived from the baseline noise monitoring conducted in Electric Centre from 4 December 2009 to 17 December 2009.
  3. 24-hour real time noise monitoring was conducted at RTN2a ˇV Hong Kong Electric Centre. No project related exceedance was recorded in the reporting month.
  4. 24-hour real time noise monitoring was conducted at RTN2a ˇV Hong Kong Electric Centre. Limit level exceedances were recorded at RTN2a-Electric Centre during daytime on 30 Sep, 2, 4, 5, 7, 8, 9, 21 and 23 Oct 2013. After checking with contractor, no major noisy construction activity was conducted at the concerned location by the Contractor during the recorded period and on-going breaking works and piling works at adjacent non-CWB Project were observed undertaken in the reporting month. As such, the exceedances were considered as non-project related.

 

Air Quality Monitoring

  xv.        Due to electricity interruption, the 24hr TSP monitoring at CMA3a was rescheduled from16 October 2013 to 17 October 2013.

  1. Due to extension of site boundary by contractor of HY/2009/19, location of air monitoring station CMA1b ˇV Oil Street Community Liaison Centre has been finely adjusted on 21 April 2012.
  2. The location ID of air monitoring station CMA1b was updated as Oil Street Site Office in April 2013.
  3. 1-hour and 24-hour Total Suspended Particulates (TSP) monitoring were conducted at CMA1b ˇV Oil Street Site Office; CMA2a ˇV Causeway Bay Community Center; CMA3a ˇV CWB PRE Site Office Area; CMA4a ˇV Society for the Prevention of Cruelty to Animals; CMA5a ˇV Children Garden opposite to Pedestrian Plaza; MA1e and MA1w ˇV International Finance Centre eastern and western wing on every six days basis.

 

Water Quality Monitoring

  1. Due to damaged geotextile enclosing the silt screen on 15 October 2013, water quality monitoring at P3 during flood tide was cancelled.
  2. Action and Limit level of water quality monitoring was transited from wet season to dry season from 1 October 2013.
  3. Since marine dredging works was commenced under contract HK/2012/08. The respective water quality monitoring station WSD19, P1, P3, P4, and P5 have been started under contract HK/2012/08 September.
  4. Water quality monitoring station RW21-P789 has been implemented with respect to HK/2009/02 started on 29 July 2013.
  5. As confirmed by CWB RSS, the marine pilling works under contract HY/2009/19 was confirmed completed by 4 March 2013.  The water quality monitoring at the respective monitoring stations C8 and C9 were temporarily suspended since 30 March 2013.
  6. WQM events on 22 April 2013 at monitoring stations C2, C3, C4e and C4w were temporarily suspended. Upon confirmation with WDII RSS and the IEC, water quality monitoring at relocated intakes monitoring location P1, P3, P4 and P5 were commenced since 24 April 2013.
  7. WDII/RSS advised that the dredging works for submarine pipeline at Victoria Harbour had been completed in January 2012. Therefore, the concurrent dredging activities at Sewage Pipeline Zone and reclamation shoreline zone TCBR under the EP-356/2009 scenario 2B no longer exist. As such, with reference to Table 5.39 of the EIA Report for Wan Chai Development Phase II and Central-Wan Chai Bypass, the application of silt screen for cooling water intakes for Queensway Government Offices was suspended and the others were remains unchanged.
  8. Based on the joint inspection on 4 Jan 2012 for the NPR area, the 4-week water quality monitoring at WSD9, WSD10, WSD15, WSD17, C8, C9 to confirm no water deterioration with respect to NPR was commenced since 7 Jan 2012 and was completed on 6 Feb 2012 water quality monitoring.
  9. Water quality monitoring at WSD10 and WSD15 will be temporary suspended while water quality monitoring at WSD9 and WSD17 was implemented with respect to HK/2009/02 from 8 Feb 12 onwards;
  10. Water quality monitoring at C8 and C9 have been implemented with respect to HY/2009/19 since the marine bore piling work started on 28 Jan 12.
  11. Due to the marine piling under Contract no. HY/2009/19 was completed on 4 March 2013, the temporary suspension of impact water quality monitoring at C8 and C9 from 4 March 2013 have been monitored for 4-week period after the completion of marine works to confirm no water deterioration.
  12. Based on the safety concern when external façade refurbishment was conducted by contractor employed by Provident Centre (C9) between 9 January 2012 to 30 July 2012 which caused to the inaccessibility of sampling either land and marine since 3 Feb 2012, there is a fine adjustment of the sampling location of water quality monitoring at C9 since 10 March 2012 to the closest accessible point prior to the completion of the external façade refurbishment work.
  13. Due to the access of water monitoring station at WSD19 was blocked by LCSD construction works from 3 April 2012 to 2 May 2012 and lead to the inaccessibility of sampling either land and marine, there is a fine adjustment of the sampling point of WSD 19 since 5 April 2012 to the closest accessible point prior to the completion of the construction activities.
  14. Due to the dredging works for Cross Harbour Water Mains from Wan Chai to Tsim Sha Tsui- DP6 was completed on 26 March 2012, the temporary suspension of impact water quality monitoring at WSD7 and WSD20 after 27 April 2012 for the water quality monitoring at WSD7 and WSD20 have been monitored for 4-week period after the completion of DP6 to confirm no water deterioration.
  15. Water quality monitoring at 14 monitoring stations was conducted three days per week during the reporting period. The action and limit level exceedances of water quality monitoring are summarized in Table I.

 

 

 

 

 

 

 

 

 

 

 

 

Table I    Summary of Water Quality Monitoring Exceedances in Reporting Month

 

Contract no.

Water Monitoring Station

Mid-flood

Mid-ebb

DO

Turbidity

SS

DO

Turbidity

SS

AL

LL

AL

LL

AL

LL

AL

LL

AL

LL

AL

LL

HK/2009/01

WSD19

0

0

4

5

0

3

0

0

0

8

0

2

 

C1

0

0

1

0

0

0

2

0

1

0

0

0

 

P1

0

0

0

0

0

0

0

0

0

0

0

0

 

P3

0

0

0

0

0

0

0

0

0

0

0

0

 

P4

0

0

0

0

0

0

0

0

0

0

0

0

P5

0

0

1

0

0

0

0

0

0

0

0

0

HK/2009/02

Monitoring started on

8 Feb 2012

WSD21

3

3

1

1

0

4

4

3

2

0

0

1

WSD9

0

0

2

0

0

1

0

0

1

0

0

0

 

WSD17

0

0

2

2

0

0

0

2

1

0

0

0

Monitoring started on

29 July 2013

RW21-P789

0

0

1

3

0

0

0

0

1

1

0

0

HY/2009/15

C7

1

1

0

0

0

0

0

1

1

0

0

0

Total

4

4

12

11

0

8

6

6

7

9

0

3

Remarks: -     The cessation of seawater intake operation for C6 was confirmed on 17 May 2011, the water monitoring at C6 was then terminated since 17 May 2011.

         -   WSD9 and WSD17 were implemented with respect to HK/2009/02 from 8 Feb 2012.

-   4-week water quality monitoring at WSD9, WSD10, WSD15, WSD17, C8 and C9 were completed on 6 Feb 2012.

-   C8 and C9 were implemented with respect to HY/2009/19 from 28 Jan 2012.

-       C8 & C9 was temporary suspended on 30 March 2013 due to the marine works for Contract no. HY/2009/19 had been completed on 4 March 2013

-   WSD7 and WSD20 water quality monitoring were temporarily suspended from 27 Apr 2012.

 

  1. Investigation found that the exceedances were not project-related. The details of the recorded exceedances can be referred to the Section 6.4.
  2. Enhanced DO monitoring at 4 monitoring stations in Causeway Bay Typhoon Shelter and Ex-Public Cargo Works Area was conducted three days per week during the reporting period. The action and limit level exceedances of water quality monitoring are summarized in Table II.

Table II   Summary of Enhanced Dissolved Oxygen Monitoring Exceedances in Reporting Month

Contract no.

Water Monitoring Station

Mid-flood

Mid-ebb

DO

DO

AL

LL

AL

LL

HY/2009/15

C6

0

0

0

0

C7

2

1

5

0

Ex-WPCWA SW

1

3

1

5

Ex-WPCWA SE

7

2

1

6

Total

10

6

7

11

 

  1. There were 17 action level exceedances and 17 limit level exceedances of enhanced dissolved oxygen recorded in this reporting month. Investigation found that the exceedances are not related to the Project works. The details of the recorded exceedances can be referred to the Section 6.4.
  2. In response to the Condition 2.18 of the Environmental Permit no. EP-356/2009 requiring that a silt curtain / impermeable barrier system be installed to channel water discharge flow from Culvert L to locations outside the embayment area, a proposed replacement of the requirement with additional dissolved oxygen monitoring has been conducted at three monitoring stations, namely A, B and C between the eastern seawall of Central Reclamation Phase III and the HKCEC Extension since November 2011 under EP-356/2009 so that DO level between the eastern seawall of Central Reclamation Phase II and the HKCEC extension could be continuously monitored.
  3. With respect to the commencement of dredging works under HK/2012/08 and the installation of MTR precast protection unit, the enhanced water quality monitoring for Culvert L was temporarily suspended since 24 July 2013.

 

Complaints, Notifications of Summons and Successful Prosecutions

  1. There was no environmental complaint received in this reporting month.

 

Site Inspections and Audit

  1. The Environmental Team (ET) conducted weekly site inspections for Contract nos. HK/2009/01, HK/2009/02, HY/2009/15 HK/2010/06, HY/2009/19, HK/2012/08 and HY/2010/08 under EP no. EP-356/2009 in the reporting month. Major observations and recommendations made during the audit sessions were rectified by the Contractors. No non-conformance was identified during the site inspections.

 

Future Key Issues

  1. In coming reporting month, the principal work activities of individual contracts are anticipated as follows:

 

Contract no. HK/2009/01 ˇV Wan Chai Development Phase II ˇV Central ˇVWanchai Bypass at HKCEC

Marine Works

ˇP          Filling works up to +4.0mPD between CH360 to CH370.

ˇP          Construction of RC structure proposed box culvert Bay 8 Wall and Bay 9 Base slab.

ˇP          D-wall construction at Stage 3.

ˇP          Outfall construction for discharge pipes at Expo Drive East.

 

 

Cooling Watermains, Salt Watermains and Sewer (On Land)

ˇP          Salt watermain laying works would be continued along west of Convention Avenue to Fenwick Pier Street in Zone A3-5C, A3-1, A3-5B, A2-4A, A5-5 & A5-2 and at Convention Avenue near Grand Hyatt hotel in Zone A1-5C, A1-5B & A1-5A3.

ˇP          Road advance works at the junction between Expo Drive East & Expo Drive Central and nearby area.

ˇP          Cooling main laying works along Expo Drive East to Fleming Road for BF, BI & BG discharge system.

 

Tunnel Works

ˇP          Installation of pre-bored H-pile in CWB Stage 2 Atrium Link.

ˇP          Construction of the south Common D-wall.

ˇP          Advance works for demolition of the HKCEC Pump home.

ˇP          ELS for Stage 1 CWB.

 

Contract no. HK/2009/02 ˇV Wan Chai Development Phase II ˇV Central ˇV Wan Chai Bypass at Wan Chai East

ˇP          60-day trial operation of P7 cooling water system.

ˇP          Leakage rectification works for P8 discharge mains at Ex-Pet Garden.

ˇP          Flexible joint rectification works for P8 discharge mains at CHBH152m.

ˇP          Hatch box replacement for P7 intake mains.

ˇP          Butterfly valve dismantling works for P7, P8 and P9 system.

ˇP          All outstanding works for handing over P7, P8 and P9 Cooling Water Pumping Stations.

ˇP          Connection with the existing DN600 salt watermains at Hung Hing Road.

ˇP          Water tightness test for Salt Water Intake Culvert.

ˇP          Removal of temporary bulkhead for commencement of wet test of the WSD Salt Water Pumping Station.

ˇP          Outstanding works at WSD Salt Water Pumping Station.

ˇP          Box Culvert N1 & Drain FRP-N and handed over to DSD

ˇP          Drainage re-diversion from temp 1800 dia. drain to the completed Box Culvert N1.

ˇP          ABWF works in Ferry Pier.

ˇP          Rectifying defects in movable ramp.

ˇP          Most of the individual T&C of E&M equipment at Ferry Pier

ˇP          Installation works for FRP Enclosure at 1/F public area, 2/F and staircase in Ferry Pier.

ˇP          Utility works and commence EVA construction extending from P7 Cooling Water Pumping Station to the Ferry Pier.

ˇP          All outstanding interface coring for Eastern Bulkhead for substantial completion of Section IXA of the Works.

ˇP          Filling works at WCR4/TWCR4 after abandonment of existing temp 1800 dia. drain at WCR4.

ˇP          Backfilling and roadworks at Hung Hing Road & Wan Shing Street for successful implementation of HHR Flyover Diversion (Stage 1) on 2 Nov 2013

 

Contract no. HY/2009/15 ˇV Central-Wanchai Bypass ˇV Tunnel (Causeway Bay Typhoon Shelter Section)

ˇP          Construction of EVA

 

Contract no. HK/2010/06 ˇV Wan Chai Development Phase II ˇV Central ˇV Wan Chai Bypass over MTR Tsuen Wan Line

ˇP          Sheet piling works

 

Contract no. HY/2009/19- Wan Chai Bypass Tunnel (North Point Section) and Island Eastern Corridor Link

ˇP          D-wall and Barrette Construction

ˇP          Removal of strut at ELS

ˇP          Construction works for Box Culvert T1

ˇP          Removal of marine platform

ˇP          Construction of pile cap, pier & cross head (Marine)

ˇP          ELS and Cut & Cover Tunnel

ˇP          Installation of dewatering well

ˇP          Laying of 1500f pipe

ˇP          Launching of segments

ˇP          Extraction of temporary pile from marine section

ˇP          Construction of bridge truss TA1

ˇP          Demolition of parapet at IEC link

ˇP          Construction of King Post at ELS

 

Contract no. HK/2012/08 ˇV Wan Chai Development Phase II ˇV Central- Wan Chai Bypass at Wan Chai West

ˇP          Site survey

ˇP          Dredging

ˇP          ELS for box culvert L at Lung King Street

ˇP          Works for abandoning watermains at Lung King Street

ˇP          Caisson seawall units installation and marine filling

 

Contract no. HY/2010/08 ˇVCentral - Wan Chai Bypass (CWB) ˇVTunnel (Slip Road 8)

ˇP          Nil

1      Introduction

1.1          Scope of the Report

1.1.1.     Lam Geotechnics Limited (LGL) has been appointed to work as the Environmental Team (ET) under Environmental Permit no. EP-356/2009 and Further Environmental permit nos. FEP-02/356/2009, FEP-03/356/2009, FEP-04/356/2009, FEP-05/356/2009, FEP-06/356/2009 and FEP-07/356/2009 to implement the Environmental Monitoring and Audit (EM&A) programme as stipulated in the EM&A Manual of the approved Environmental Impact Assessment (EIA) Report for Wan Chai Development phase II and Central-Wan Chai Bypass (Register No.: AEIAR-125/2008) and in the EM&A Manual of the approved EIA Report for Central-Wan Chai Bypass and Island Eastern Corridor Link (Register No. AEIAR-014/2001).

1.1.2.     This report presents the environmental monitoring and auditing work carried out in accordance to the Section 10.3 of EM&A Manual and ˇ§Environmental Monitoring and Audit Requirementsˇ¨ under Particular Specification Section 27.

1.1.3.     This report documents the finding of EM&A works for Environmental Permit no. EP-356/2009, Further Environmental Permit no. FEP-02/356/2009, FEP-03/356/2009, FEP-04/356/2009, FEP-05/356/2009, FEP-06/356/2009 and FEP-07/356/2009 during the period of September 2013 to October 2013. The cut-off date of reporting is at 27th of each reporting month.

 

1.2          Structure of the Report

 

Section 1        Introduction ˇV details the scope and structure of the report.

 

Section 2        Project Background ˇV summarizes background and scope of the project, site description, project organization and contact details of key personnel during the reporting period.

 

Section 3        Status of Regulatory Compliance ˇV summarizes the status of valid Environmental Permits / Licenses during the reporting period.

 

Section 4        Monitoring Requirements ˇV summarizes all monitoring parameters, monitoring methodology and equipment, monitoring locations, monitoring frequency, criteria and respective event and action plan and monitoring programmes.

 

Section 5        Monitoring Results ˇV summarizes the monitoring results obtained in the reporting period.

 

Section 6        Compliance Audit ˇV summarizes the auditing of monitoring results, all exceedances environmental parameters.

 

Section 7        Cumulative Construction Impact due to the Concurrent Projects ˇV summarizes the relevant cumulative construction impact due to the concurrent activities of the concurrent Projects.

 

Section 8        Site Inspection ˇV summarizes the findings of weekly site inspections undertaken within the reporting period, with a review of any relevant follow-up actions within the reporting period.

 

Section 9        Complaints, Notification of summons and Prosecution ˇV summarizes the cumulative statistics on complaints, notification of summons and prosecution

 

Section 10       Conclusion

2      Project Background

2.1          Background

2.1.1.     ˇ§Wan Chai Development phase II and Central-Wan Chai Bypassˇ¨ and ˇ§Central-Wan Chai Bypass and Island Eastern Corridor Linkˇ¨ (hereafter called ˇ§the Projectˇ¨) are Designed Project (DP) under the Environmental Impact Assessment Ordinance (Cap. 499) (EIAO). The Environmental Impact Assessment (EIA) Reports for Central-Wan Chai Bypass and Island Eastern Corridor Link (Register No. AEIAR-041/2001) and Wan Chai Development phase II and Central-Wan Chai Bypass (Register No.: AEIAR-125/2008) have been approved on 31 August 2001 and 11 December 2008 respectively.

2.1.2.     The key purpose of Wan Chai Development Phase II (WDII) is to provide land at Wan Chai North and North Point for construction of the Central-Wan Chai Bypass and Island Eastern Corridor Link (CWB). Land formed under the project will be developed as a world-class waterfront promenade joining that at the new Central waterfront for public enjoyment.

2.1.3.     There is a compelling and present need for the CWB to provide relief to the very congested east-west Connaught Road Central/Harcourt Road / Gloucester Road Corridor (the Corridor) which is currently operating beyond its capacity. The CWB will provide relief to the existing congestion along the Corridor and cater for the anticipated growth of traffic on Hong Kong Island. Without the CWB and its access roads, there will not be sufficient capacity to serve the heavy traffic demands at both strategic and local levels.

 

2.2          Scope of the Project and Site Description

2.2.1.     The Project is located mainly in Wan Chai North, Causeway Bay and North Point, and is demarcated by Gloucester Road and Victoria Park Road to the south, Fenwick Pier Street to the west and Tong Shui Road Interchange to the east, as shown in Figure 2.1.

2.2.2.     The study area encompasses existing developments along the Wan Chai, Causeway Bay and North Point shorelines. Major land uses include the Hong Kong Convention & Exhibition Centre (HKCEC) Extension, the Wan Chai Ferry Pier, the ex-Wan Chai Public Cargo Working Area (ex-PCWA), the Royal Hong Kong Yacht Club (RHKYC), the Police Officersˇ¦ Club, the Causeway Bay Typhoon Shelter (CBTS) and commercial and residential developments.

2.2.3.     The scope of the Project comprises:

ˇP          Land formation for key transport infrastructure and facilities, including the Trunk Road (i.e. CWB) and the associated slip roads for connection to the Trunk Road and for through traffic from Central to Wan Chai and Causeway Bay. The land formed for the above transport infrastructure will provide opportunities for the development of an attractive waterfront promenade for the enjoyment of the public

ˇP          Reprovisioning / protection of the existing facilities and structures affected by the land formation works mentioned above

ˇP          Extension, modification, reprovisioning or protection of existing storm water drainage outfalls, sewerage outfalls and watermains affected by the revised land use and land formation works mentioned above

ˇP          Upgrading of hinterland storm water drainage system and sewerage system, which would be rendered insufficient by the land formation works mentioned above

ˇP          Provision of the ground level roads, flyovers, footbridges, necessary transport facilities and the associated utility services

ˇP          Construction of the new waterfront promenade, landscape works and the associated utility services

ˇP          The Trunk Road (i.e. CWB) within the study area and the associated slip roads for connection to the Trunk Road.

 

2.2.4.     The project also contains various Schedule 2 DPs that, under the EIAO, require Environmental Permits (Eps) to be granted by the DEP before they may be either constructed or operated. Table 2.1 summarises the five individual DPs under this Project. Figure 2.1 shows the locations of these Schedule 2 DPs.

Table 2.1      Schedule 2 Designated Projects under this Project

Item

Designated Project

EIAO Reference

Reason for inclusion

DP1

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Schedule 2, Part I, A.1 and A.7

Trunk road and road tunnel more than 800 m in length

DP2

Road P2 and other roads which are classified as primary/district distributor roads

Schedule 2, Part I, A.1

Primary / district distributor roads

DP3

Reclamation works including associated dredging works

Schedule 2, Part I, C.1 and C.12

Reclamation more than 5 ha in size and a dredging operation less than 100 m from a seawater intake point

DP5

Wan Chai East Sewage Outfall

Schedule 2, Part I, F.5 and F.6

Submarine sewage pipelines with a total diameter more than 1,200 mm and include a submarine sewage outfall

DP6

Dredging for the Cross-harbour Water Mains from Wan Chai to Tsim Sha Tsui

Schedule 2, Part I, C.12

A dredging operation less than 100 m from a seawater intake point

 

2.3          Division of the Project Responsibility

2.3.1.     Due to the multi-contract nature of the Project, there are a number of contracts sub-dividing the whole works area into different work areas to be commenced. Contractors of individual contracts will be required by the EP holder to apply Further Environmental Permits (FEP) such that the impact monitoring stations are sub-divided accordingly to facilitate the implementation of EM&A programme and to streamline the EM&A reporting for individual FEP holders correspondingly.

2.3.2.     The details of individual contracts are summarized in Table 2.2.

 

 

 

Table 2.2 Details of Individual Contracts under the Project

Contract No.

Contract Title

Associated DP(s)

Construction Commencement Date

HK/2009/01

Wan Chai Development Phase II ˇV Central ˇVWanchai Bypass at Hong Kong Convention and Exhibition Centre

DP3, DP6

23 July 2010

DP1, DP2

25 August 2011

HK/2009/02

Wan Chai Development Phase II ˇV Central ˇV Wan Chai Bypass at WanChai East

DP3, DP5

5 July 2010

DP1

26 April 2011

HY/2009/11

Wan Chai Development Phase II and Central ˇV Wan Chai Bypass ˇV North Point Reclamation

DP3

17 March 2010

HY/2009/15

Central-Wanchai Bypass ˇV Tunnel (Causeway Bay Typhoon Shelter Section)

DP3

10 November 2010

DP1

13 July 2011

HK/2010/06

Wan Chai Development Phase II-Central-Wan Chai Bypass over MTR Tsuen Wan Line

DP3

22 March 2011

04/HY/2006

Reconstruction of Bus Terminus near Man Yiu Street and Man Kwong Street

DP1

September 2010

HY/2009/17

Central ˇV Wan Chai Bypass (CWB) at FEHD Whitfield Depot ˇV Advanced piling works.

DP1

5 October 2010

HY/2009/18

Central ˇV Wan Chai Bypass (CWB) ˇV Central Interchange

DP1

21 April 2011

HY/2009/19

Central ˇV Wanchai Bypass Tunnel (North Point Section) and Island Eastern Corridor Link

DP1

24 March 2011

HK/2012/08

Wan Chai Development Phase II Central-

Wan Chai Bypass at Wan Chai

West

DP1,DP2, DP3

5 March 2013

HY/2010/08

Central- Wanchai Bypass Tunnel ˇV Tunnel (Slip Road 8)

DP1, DP2, DP3

21 March 2013

 

2.4          Project Organization and Contact Personnel

2.4.1.     Civil Engineering and Development Department and Highways Department are the overall project controllers for the Wan Chai Development Phase II and Central-Wan Chai Bypass respectively. For the construction phase of the Project, Project Engineer, Contractor(s), Environmental Team and Independent Environmental Checker are appointed to manage and control environmental issues.

2.4.2.     The proposed project organization and lines of communication with respect to environmental protection works are shown in Figure 2.2. Key personnel and contact particulars are summarized in Table 2.3:

Table 2.3 Contact Details of Key Personnel

Party

Role

Post

Name

Contact No.

Contact Fax

AECOM

Engineerˇ¦s Representative for WDII

Principal Resident Engineer

Mr. Frankie Fan

2587 1778

2587 1877

Engineerˇ¦s Representative for CWB

Principal Resident Engineer

Mr. Peter Poon

3912 3388

3912 3010

Chun Wo ˇV Leader Joint Venture

Contractor under Contract no. HK/2009/01

Joint Venture Board Representative

Mr. PL Yue

2162 9909

2587 1878

Deputy Site Agent

Mr Andy Yu

9648 4896

Construction Manager

Mr Terry Wong

9757 9846

Construction Manager

Mr. Wyman Wong

9627 2467

Construction Manager

Mr Kenneth Chan

9160 3850

Environmental Officer (Compliance Manager)

Mr. Andy Mak

9103 2370

Environmental Supervisor

Fan Chun Wai

6487 4488

Chun Wo ˇV CRGL Joint Venture

Contractor under Contract no. HK/2009/02

Project Manager

Mr. David Lau

3658-3022

2827 9996

Quality & Environmental Manager

Mr. C.P. Ho

9191 8856

China State Construction Engineering (HK) Ltd.

Contractor under Contract no. HY/2009/15

Project Director

K C Cheung

3557 6399

2566 2192

 

Site Manager

J H Chen

3557 6368

 

 

Contractorˇ¦s Representative

Andrew Wong

3557 6358

 

 

Head of Construction

Manager

Roger Cheung

3557 6371

 

 

Senior Construction Manager

Gene Cheung

3557 6395

 

 

Environmental Officer

Mr. Daniel Sin

3557 6347

Gammon

-Leader JV

Contractor under Contract no. HK/2010/06

Project Manager

Mr. Paul Lui

9095 7922

2529 2880

Site Agent

Mr. Eric Yip

2529 2068