Project Scope

Project Scope

 The major scope of the WDII Project:  

dot
Land formation along Wan Chai North and North Point including seawalls construction;
dot
Reprovisioning of the affected existing waterfront facilities including cross harbour water mains, submarine sewage outfall pipelines, ferry piers, cooling water pumping systems and a salt water pumping station;
dot
Extension of Road P2 from Central Reclamation Phase III to Wan Chai and realignment of the existing Convention Avenue;
dot
Modification of existing roads for connection with the slip roads of the CWB;
dot
Construction of a footbridge along Wan Shing Street;
dot
Construction of three pedestrian landscaped decks to the west of Hong Kong Convention and Exhibition Centre (HKCEC), the north of the Wan Chai North PTI and the north of Victoria Park; and
dot
Construction of stormwater box culverts, stormwater drainage works, sewerage, associated associated hinterland and landscaping works.
dot

  The proposed Central - Wan Chai Bypass and Island Eastern Corridor Link is a 4.5 km long dual three-lane trunk road with a 3.7 km long tunnel. It will link up the Rumsey Street Flyover at Central with the Island Eastern Corridor at North Point near City Garden.   The major elements of the project include:  

dot
road tunnels and elevated roads;
dot
associated slip roads and approach roads to the tunnels;
dot
electrical and mechanical systems, including traffic control and surveillance systems;
dot
ancillary buildings for tunnel administration and ventilation; and
dot
ancillary works including noise barriers, drainage and landscaping works.