Project EM&A Manual
The EM&A Manual for the project, "Central - Wan Chai Bypass and Island Eastern Corridor Link" (EIA-057/2001), was submitted under the EIAO with the EIA Report.
Click here to view EIA Report |
The EM&A Manual for the project, "Wan Chai Development Phase II and Central-Wan Chai Bypass" (EIA-141/2007), was submitted under the EIAO with the EIA Report.